Research on the scheduling algorithm based on the resource transport path of the contingency cellular network

被引:0
|
作者
Li, Xiaoguang [1 ]
Yang, Tao [1 ]
机构
[1] Department of Electrical Engineering and Automation, Luoyang Institute of Science and Technology, Luoyang, Henan, China
来源
Open Cybernetics and Systemics Journal | 2014年 / 8卷 / 01期
关键词
Algorithm efficiency - CCN - Construction scheduling - Fast heuristic algorithms - Natural disasters - Optimal scheduling - Optimal solutions - Relative distances;
D O I
暂无
中图分类号
学科分类号
摘要
Considering the relative distance among the base stations, the time and the relief profits in the base stations, the paper proposes optimal scheduling models CCNDS-AC and CCNDS-UC which are fit for the Resource Transport Path of the Contingency Cellular Network with the topology-tree structure. When a large natural disaster happens, time is rather urgent and the admissible computing time is quite short, two kinds of the fast heuristic algorithms are proposed: DS-ACG and DS-UCB so that a group of the construction scheduling order which is approximating the optimal solution is obtained in the short time. The experimental results show that the proposed algorithm efficiency can effectively improve 16% so that the maximal total relief benefits can be reached. © Li and Yang; Licensee Bentham Open.
引用
收藏
页码:606 / 612
相关论文
共 50 条
  • [21] Cellular Particle Swarm Scheduling Algorithm for Virtual Resource Scheduling of Cloud Computing
    Yuan, Hao
    Li, Changbing
    Du, Maokang
    INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2015, 8 (03): : 299 - 308
  • [22] Research on online scheduling and charging strategy of robots based on shortest path algorithm
    Fu, Xiao
    Cheng, Zongmao
    Wang, Jiaxin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 153
  • [23] Research on Cloud Computing Resource Scheduling Based on User Satisfaction Based Genetic Algorithm
    Wei, Guanghui
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2018), 2018, : 81 - 85
  • [24] On the Algorithm of Cargoes Transportation Scheduling in the Transport Network
    Ignatov, A. N.
    AUTOMATION AND REMOTE CONTROL, 2023, 84 (09) : 993 - 1004
  • [25] On the Algorithm of Cargoes Transportation Scheduling in the Transport Network
    A. N. Ignatov
    Automation and Remote Control, 2023, 84 : 993 - 1004
  • [26] Cloud Computing Resource Scheduling Method Research Based on Improved Genetic Algorithm
    Cui Yun-fei
    Li Xin-ming
    Dong Ke-wei
    Zhu Ji-lu
    ADVANCED MATERIALS AND INFORMATION TECHNOLOGY PROCESSING, PTS 1-3, 2011, 271-273 : 552 - +
  • [27] Research on Cloud Computing Resource Scheduling Based on PSO-MC Algorithm
    Xu Zhe-jun
    INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2015, 8 (04): : 153 - 161
  • [28] Research on Information Processing with Delay Fair Scheduling Algorithm based on Resource Situation
    Jiang, Xueying
    Yang, Yang
    Jing, Di
    ADVANCED DEVELOPMENT OF ENGINEERING SCIENCE IV, 2014, 1046 : 363 - 366
  • [29] Research on fuzzy clustering based algorithm for resource scheduling in virtual computing environment
    Zhu, Chun-Ge
    Zhang, Zhe-Yu
    Liu, Xin-Ran
    Sun, Bin
    Zhang, Hong
    Beijing Youdian Daxue Xuebao/Journal of Beijing University of Posts and Telecommunications, 2015, 38 : 6 - 9
  • [30] Dynamic Resource Scheduling Algorithm For Public Safety Network
    Kim, Hyunwoo
    Jo, Junho
    Park, Changyong
    Ahn, Sangkwon
    Chin, Hosub
    Park, Pyongsu
    Kim, Youngsik
    2018 UKSIM-AMSS 20TH INTERNATIONAL CONFERENCE ON COMPUTER MODELLING AND SIMULATION (UKSIM), 2018, : 127 - 132