共 32 条
[21]
Zhang Q., Yu Z., Discrete fruit fly optimization algorithm based on dominant population for solving no-wait flow shop scheduling problem, Computer Integrated Manufacturing Systems, 23, 3, pp. 609-615, (2017)
[22]
Pan Q., Wang W., Zhu J., Modified discrete particle swarm optimization algorithm for no-wait flow shop problem, Computer Integrated Manufacturing Systems, 13, 6, pp. 1127-1130, (2007)
[23]
Riahi V., Kazemi M., A new hybrid ant colony algorithm for scheduling of no-wait flowshop, Operational Research, 18, 1, pp. 55-74, (2018)
[24]
Bozejko W., Makuchowski M., Solving the no-wait job-shop problem by using genetic algorithm with automatic adjustment, International Journal of Advanced Manufacturing Technology, 57, 5-8, pp. 735-752, (2011)
[25]
Sundar S., Suganthan P.N., Jin C.T., Et al., A hybrid artificial bee colony algorithm for the job-shop scheduling problem with no-wait constraint, Soft Computing, 21, 5, pp. 1193-1202, (2017)
[26]
Pan J., Huang H.C., A hybrid genetic algorithm for no-wait job shop scheduling problems, Expert Systems with Applications, 36, 3, pp. 5800-5806, (2009)
[27]
Xie Z., Li Z., Hao S., Et al., Study on complex product scheduling problem with no-wait constraint between operations, Acta Automatica Sinica, 35, 7, pp. 983-989, (2009)
[28]
Wang L., Job Shop Scheduling And its Genetic Algorithm, (2003)
[29]
Su C., Ke Y., Task planning and decoupling strategy for collaborative design, Computer Integrated Manufacturing Systems, 12, 1, pp. 21-26, (2006)
[30]
Hou E.S.H., Ansari N., Ren H., A genetic algorithm for multiprocessor scheduling, IEEE Trans Parallel and Distributed Systems, 5, 2, pp. 113-120, (1994)