共 50 条
- [1] Load restoration optimization considering dynamic constraints during initial period of power system recovery Dianwang Jishu/Power System Technology, 2014, 38 (09): : 2441 - 2448
- [2] Load restoration considering load fluctuation rate and load complementary coefficient Dianwang Jishu/Power System Technology, 2014, 38 (09): : 2490 - 2496
- [3] A restoration strategy for a local power system considering critical load pickup Wen, F. (fushuan.wen@gmail.com), 1600, Automation of Electric Power Systems Press (37):
- [4] Multi-period Load Restoration in Distribution System Considering Crew Dispatch 2022 IEEE/IAS INDUSTRIAL AND COMMERCIAL POWER SYSTEM ASIA (I&CPS ASIA 2022), 2022, : 1736 - 1741
- [5] Study on small power fluctuation caused by transformer saturation in initial period of power system restoration Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (19): : 203 - 207
- [7] Optimal Restoration of a Power Distribution System During Extreme Events Considering Load Criticality 2023 NORTH AMERICAN POWER SYMPOSIUM, NAPS, 2023,
- [9] The Probabilistic Load Flow Analysis of Power System Considering the Fluctuation of Smelting Load 2017 IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2017, : 339 - 343
- [10] Hybrid genetic algorithm for power system load restoration Diangong Jishu Xuebao, 2007, 2 (105-109): : 105 - 109