Numerical simulation of dewatering thick unconsolidated aquifers for safety of underground coal mining

被引:0
作者
State Key Laboratory for Coal Resources and Mining Safety, School of Resources and Geoscience, China University of Mining and Technology, Xuzhou, Jiangsu 221008, China [1 ]
机构
[1] State Key Laboratory for Coal Resources and Mining Safety, School of Resources and Geoscience, China University of Mining and Technology, Xuzhou
来源
Min. Sci. Technol. (China) | 2009年 / 3卷 / 312-316期
基金
中国国家自然科学基金;
关键词
drainage; mining under water body; numerical simulation; unconsolidated aquifer; water and sand inrush;
D O I
10.1016/S1674-5264(09)60058-2
中图分类号
学科分类号
摘要
With an increase of mining the upper limits under unconsolidated aquifers, dewatering of the bottom aquifer of the Quaternary system has become a major method to avoid water and sand inrushes. In the 8th District of the Taiping Coal Mine in south-western Shandong province, the bottom aquifer of the Quaternary system is moderate to excellent in water-yielding capacity. The base rock above the coal seam is very thin in the concealed coal field of the Carboniferous and Permian systems. Therefore, a comprehensive dewatering plan from both the ground surface and the panel was proposed to lower the groundwater level in order to ensure mining safety. According to the hydrogeologic conditions of the 8th District, we established a numerical model so that we could simulate the groundwater flow in the dewatering process. We obtained the simulation parameters from previous data using backward modeling, such as the average coefficient of permeability of 12 m/d and the elastic storage coefficient of 0.002. From the same model, we predicted the movement of groundwater and water level variables and obtained the visible effect of the dewatering project. Despite the overburden failure during mining, no water and/or sand inrush occurred because the groundwater level in the bottom aquifer was lowered to a safe water level. © 2009 China University of Mining and Technology.
引用
收藏
页码:312 / 316
页数:4
相关论文
共 24 条
  • [1] Zhu C.F., Coal pillar design and practice concerning quicksand within thick overlying Quaternary sediments, Coal Geology & Exploration, 34, 1, pp. 19-20, (2006)
  • [2] Qong Q.H., Man H.Y., Gui D.W., Research on water-keeping mining under thick unconsolidated strata adjacent to weathered zone with GIS, Journal of China University of Mining & Technology, 33, 2, pp. 190-192, (2004)
  • [3] Chen Y.L., Gao R.J., Zhou J.H., Liu C.L., Wang D.G., Wang H.G., Gao D.F., Full mechanized caving mining under large scale surface water and huge thick unconsolidated aquifers, Mine Surveying, 1, pp. 79-81, (2006)
  • [4] Tan S.Y., Wu J.S., Cause analysis of water bursting in 7114 mining face of 71 coal seam in Qidong colliery, Coal Mining Technology, 11, 3, pp. 64-67, (2006)
  • [5] Gui H.R., Song X.M., Forecasting the underground waters regime in the pitching aquifers in Huainan mining area, Journal of Coal Science & Engineering, 7, 1, pp. 46-51, (2001)
  • [6] Sui W.H., Dong Q.H., Di Q.S., Application of engineering geological model in research of safety pillars under water bodies, Journal of China University of Mining & Technology, 28, 5, pp. 417-420, (1999)
  • [7] Sun Y.J., Xu Z.M., Dong Q.H., Liu S.D., Gao R.B., Jiang Y.H., Forecasting water disaster for a coal mine under the Xiaolangdi reservoir, Journal of China University of Mining and Technology, 18, 4, pp. 516-520, (2008)
  • [8] Gao Q.H., Liu S.L., Reasonable understanding of hydrogeologic condition in coal mines and safe mining coal resources under sand aquifers, Heilongjiang Land & Resource, 12, pp. 36-37, (2006)
  • [9] Xuan Y.Q., Research on movement and evolution law of breaking of overlying strata in shallow coal seam with a thin bedrock, Rock and Soil Mechanics, 29, 2, pp. 512-516, (2008)
  • [10] Zhang Y.J., Kang Y.H., Liu X.E., Predicting on inrush of sand of mining under loosening sandstone aquifer, Journal of China Coal Society, 31, 4, pp. 429-432, (2006)