共 50 条
[41]
Face Stability of Shield Tunnel in Sandy Cobble Stratum with Continuum-Based Discrete Element Method
[J].
Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University,
2019, 54 (03)
:499-506and586
[42]
Experimental study on excavation-seepage stability for shallow shield tunnel in sandy ground with clay
[J].
Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology,
2021, 53 (11)
:59-65
[44]
Physical model tests on stability of shield tunnel face in saturated gravel stratum
[J].
Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,
2019, 41
:129-132
[45]
Investigation on the Surface Settlement of Curved Shield Construction in Sandy Stratum with Laboratory Model Test
[J].
Geotechnical and Geological Engineering,
2021, 39
:5493-5504
[46]
Research on calculation model of limit support pressure on shield face in sandy cobble stratum
[J].
Tiedao Xuebao,
2013, 7 (114-122)
:114-122
[47]
Experimental study on EPB shield tunnel construction in soft ground
[J].
Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,
2007, 29 (12)
:1849-1857
[50]
Construction technology of earth pressure balance shield in watery sandy stratum
[J].
Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,
2009, 31 (09)
:1445-1449