Research on the Path of Cost Control and Economic Benefit Enhancement in Construction Engineering Projects

被引:0
作者
Chen, Liang [1 ]
Tang, Yu [2 ]
机构
[1] Chongqing University of Posts and Telecommunications, Chongqing
[2] Chongqing Jiaotong University, Chongqing
关键词
Construction project; Cost control; Economic benefit; Genetic algorithm; Return on investment;
D O I
10.2478/amns-2024-2618
中图分类号
学科分类号
摘要
The increasingly competitive market situation in the construction industry requires that construction enterprises strengthen the cost control of construction projects in order to improve the economic efficiency of enterprises. This paper is based on the improved genetic algorithm to realize the optimization of the cost control strategy of the construction project and effectively overcome the problems of weak cost control consciousness and high material procurement cost in the previous cost control. A construction company is selected as the object for the case study, and the genetic algorithm is used to calculate and analyze the cost control of the construction company. The return on investment, net present value, and internal rate of return are used as indicators to measure the economic benefits before and after optimizing cost control strategies. The improved genetic algorithm calculates that among the cost control factors of the construction company, procurement management, and field operation have a high probability of being selected in the genetic calculation, and the final project cost is 36.7849 million yuan through the genetic algorithm, which achieves the goal of project cost control. At the same time, this paper finds that cost control has a significant positive effect on the improvement of economic efficiency, and the economic efficiency of this construction company before and after the optimization of the cost control strategy is significantly improved. © 2024 Liang Chen and Yu Tang, published by Sciendo.
引用
收藏
相关论文
共 16 条
  • [1] Du G., Research on Problems and Strategies of Optimisation in Construction Project Management, International Journal of Frontiers in Engineering Technology, 5, 10, (2023)
  • [2] Torp O., Belay A.M., Thodesen C., Klakegg O.J., Cost development over-time at construction planning phase: Empirical evidence from Norwegian construction projects, Procedia Engineering, 145, pp. 1177-1184, (2016)
  • [3] Al-Nady B.A.H.A., Al-Hawary S.I.S., Alolayyan M.N., The role of time, communication, and cost management on project management success: An empirical study on sample of construction projects customers in Makkah City, Kingdom of Saudi Arabia, International Journal of Services and Operations Management, 23, 1, pp. 76-112, (2016)
  • [4] Badewi A., The impact of project management (PM) and benefits management (BM) practices on project success: Towards developing a project benefits governance framework, International journal of project management, 34, 4, pp. 761-778, (2016)
  • [5] Ciriacy-Wantrup S.V., Bishop R.C., Andersen S.O., Benefit-cost analysis and public resource development, Natural Resource Economics, pp. 135-147, (2019)
  • [6] Rafiei M.H., Adeli H., Novel machine-learning model for estimating construction costs considering economic variables and indexes, Journal of construction engineering and management, 144, 12, (2018)
  • [7] Li Y., Liu C., Applications of multirotor drone technologies in construction management, International Journal of Construction Management, 19, 5, pp. 401-412, (2019)
  • [8] Memon A.Q., Memon A.H., Soomro M.A., Mitigating resource management related factors affecting time and cost performance in construction projects, Pakistan Journal of Engineering and Technology, 4, 2, pp. 62-66, (2021)
  • [9] Kivila J., Martinsuo M., Vuorinen L., Sustainable project management through project control in infrastructure projects, International Journal of Project Management, 35, 6, pp. 1167-1183, (2017)
  • [10] Ul Musawir A., Serra C.E.M., Zwikael O., Ali I., Project governance, benefit management, and project success: Towards a framework for supporting organizational strategy implementation, International Journal of Project Management, 35, 8, pp. 1658-1672, (2017)