共 50 条
- [2] Study on technology of fully-mechanized sub-level caving mining technology in the datong permo carboniferous coal seam SUSTAINABLE DEVELOPMENT OF NATURAL RESOURCES, PTS 1-3, 2013, 616-618 : 565 - +
- [3] Study on Numerical Simulation of Optimization of the Width of Coal Pillar in Caving Roadway at Fully-Mechanized Caving Face of Deep Mine PROCEEDINGS OF 2015 INTERNATIONAL SYMPOSIUM - SAFETY AND HIGH EFFICIENCY MINING IN COAL, 2015, : 63 - 70
- [4] Strata control at the face with fully mechanized sub-level caving MINE PLANNING AND EQUIPMENT SECTION 1997, 1997, : 293 - 296
- [5] Experimental study of reasonable coal pillar width in fully mechanized top coal caving face of deep thick coal seam Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (03): : 539 - 548
- [6] Ground control in fully mechanized sub-level caving in bottom slice Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 1998, 17 (02): : 159 - 166
- [7] Recent developments - and some problems - in the application of fully-mechanized longwall mining, using sub-level caving, in China Coal Int (Redhill Engl), 6 (224):
- [8] Reasonable Width of Coal Pillar in Stop Mining Line of Fully Mechanized Caving Mining in Extra-Thick Coal Seam ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (05): : 1189 - 1200
- [9] Determination of reasonable position and stability analysis of finishing cut in fully-mechanized coal face with topped caving Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2004, 23 (12): : 1981 - 1985