共 12 条
[1]
Anagmostakis I., Clarke J., Bohme D., Volckers U., Runway Operations Planning and control:Sequencing and Scheduling, Journal of Aircraft, 38, 6, (2001)
[2]
Beasley J.E., Krishnamoorthy M., Sharaiha Y.M., Abramson D., Scheduling aircraft landings - The static case, Transportation Science, 34, pp. 180-197, (2000)
[3]
Bianco L., Dell'Olmo P., Giordani S., Scheduling models and algorithms for TMA traffic management, Modelling and Simulation in Air Traffic Management, pp. 139-168, (1997)
[4]
Adacher L., Pacciarelli D., Paluzzi D., Pranzo M., Scheduling arrivals and departures in a busy airport, 5th Triennial Symposium on Transportation Analysis, Le Gosier, Guadaloupe (2004)
[5]
Dear R.G., Sherif Y.S., An algorithm for computer assisted sequencing and scheduling of terminal area operations, Transportation Research A, 25, pp. 129-139, (1991)
[6]
Neuman F., Erzberger, Analysis of Sequencing and Scheduling Methods for Arrival Traffic, NASA Technical Memorandum 102795, (1990)
[7]
Neuman F., Erzberger, Analysis of Delay reducing and Fuel saving sequencing and spacing algorithms for arrival spacing, NASA Technical Memorandum 103880, (1991)
[8]
Bianco L., Dell'Olmo P., Giordani S., Aircraft Flow Scheduling in the Terminal Maneuvering Area, Proceedings of the Triennial Symposium on Transportation Analysis (TRISTAN IV), Sao Miguel, Portugal, pp. 281-286, (2001)
[9]
Mascis A., Pacciarelli D., Job shop scheduling with blocking and no-wait constraints, European Journal of Operational Research, 143, 3, pp. 498-517, (2002)
[10]
Roy B., Sussman B., Les Problèm d'Ordonnancement Avec Contraintes Disjonctives, (1964)