共 50 条
[32]
Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags
[J].
Operational Research,
2015, 15
:95-114
[34]
Permutation flowshop problem with time lags scheduling by logic-based Benders decomposition
[J].
2013 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT),
2013,
:851-856
[37]
Stochastic two-machine flowshop scheduling problem with total completion time criterion
[J].
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE,
2005, 12 (02)
:159-171
[38]
ANALYTIC CHARACTERIZATION OF ADMISSIBLE SCHEDULING SUBJECT TO FLOWSHOP HETEROGENEOUS CONSTRAINTS
[J].
RAIRO-AUTOMATIQUE-PRODUCTIQUE INFORMATIQUE INDUSTRIELLE-AUTOMATIC CONTROL PRODUCTION SYSTEMS,
1991, 25 (01)
:87-102