Optimal design of a power tunnel

被引:0
|
作者
机构
[1] Visiting Faculty, Department of Civil Engineering, Indian Institute of Technology Kanpur, Kanpur
[2] Guest Faculty, Department of Water Resources Development and Management, Indian Institute of Technology Roorkee, Roorkee, Uttarakhand
关键词
Degree of difficulty; Geometric programming; Tunnel engineering; Water power and water resources engineering;
D O I
10.1080/09715010.2012.742288
中图分类号
学科分类号
摘要
Estimation of optimal tunnel diameter is a challenging problem in the design of hydropower stations. Determination of tunnel diameter is a complex problem as it involves large numbers of variables. In this paper, a power tunnel design has been formulated as a geometric programming problem with a single degree of difficulty. Solution of the problem yields optimal tunnel diameter along with information regarding optimal contributions of various cost components in the total cost. © 2013 Indian Society for Hydraulics.
引用
收藏
页码:21 / 26
页数:5
相关论文
共 50 条
  • [31] An Optimal Power Allocation Scheme for the STC Hybrid-ARQ over Energy Limited Networks
    Liu, Hongbo
    Razoumov, Leonid
    Mandayam, Narayan
    Spasojevic, Predrag
    IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, 2009, 8 (12) : 5718 - 5722
  • [32] Monitoring Measurement Case Study of Tunnel Ground Subsidence in Qiyueshan Tunnel
    Lu, Wei
    Zhang, Yanhuan
    Xu, Zhenhao
    Zhou, Hongyun
    Li, Shucai
    Li, Liping
    Wu, Jing
    Zhou, Lun
    ARCHITECTURAL ENGINEERING AND NEW MATERIALS, 2015, : 145 - 153
  • [33] Optimal Power Allocation for Non-Orthogonal Multiple Access VLC Systems with Shot Noise
    Cang, Yihan
    Chen, Ming
    Xu, Zheng
    Yang, Zhaohui
    Zhao, Jingwen
    Ben, Yanglin
    Cao, Binghao
    Huang, Chongwen
    2022 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE (WCNC), 2022, : 7 - 12
  • [34] Research on Dynamic Design and Intelligent Decision-making Method for Whole Process Informatization of Tunnel Active Support System
    Tian S.
    Li S.
    Liu D.
    Wang M.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (11): : 1 - 10
  • [35] Study on the minimum safe thickness of water inrush prevention in karst tunnel under the coupling effect of blasting power and water pressure
    Li, Liping
    Jin, Hao
    Tu, Wenfeng
    Zhou, Zongqing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 153
  • [36] Study on deformation patterns of tunnel isolation layers and seismic response of a shield tunnel
    Lu, Jiahui
    Luo, Junjie
    Huang, Xiangyun
    Hong, Junliang
    Lu, Yi
    Zhou, Fulin
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2024, 187
  • [37] Near Optimal Power Splitting Protocol for Energy Harvesting based Two Way Multiple Relay Systems
    Alsharoa, Ahmad
    Ghazzai, Hakim
    Kamal, Ahmed E.
    Kadri, Abdullah
    2017 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE (WCNC), 2017,
  • [38] Study on anti-dislocation design parameters of tunnel structure with flexible joints crossing fault based on simplified analytical method
    Chang, Mingyu
    Shen, Yusheng
    Wang, Haokang
    Pan, Xiaohai
    Zhang, X.
    Di, Cheng
    Luo, Y.
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2025, 191
  • [39] Research on the tunnel entrance night light environment of highway tunnel based on visual safety
    Hu J.-B.
    Zhang X.-Q.
    Guo D.
    Zhang, Xiao-Qin (1018604699@qq.com), 1600, Beijing Institute of Technology (36): : 487 - 490and497
  • [40] Selection of optimal transmit power in multi-hop underlay cognitive full-duplex relay networks
    Poornima S.
    Babu A. V.
    EURASIP Journal on Wireless Communications and Networking, 2018