A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration

被引:0
|
作者
Parveen, Sultana [1 ]
Saha, Surajit Kumar [2 ]
机构
[1] Department of Industrial and Production Engineering, Bangladesh University of Engineering and Technology
[2] Titas Gas Transmission and Distribution Company Ltd., Dhaka-1215, 105, Kazi Nazrul Islam Avenue
关键词
Algorithm; CPM; Critical path method; Fuzzy set; Fuzzy time-resources trade-off; GA; Genetic algorithm; Multi-objective optimisation; TCTP; Time-cost trade-off problems;
D O I
10.1504/IJISE.2013.056094
中图分类号
学科分类号
摘要
The project managers' major concern is to complete project cost effectively and timely. But, in real life, the project completion time and cost may vary significantly as an effect of uncertainty such as weather, political and social disturbances, inflation, site congestion, human factors, productivity level, etc. Minimisation of project cost directly depends on proper utilisation of resources. Therefore, a GA-based fuzzy optimal model is proposed in this study incorporating multi-objective approach (MAWA) for project time-cost trade-off. In this study, fuzzy set theory is applied to model the managers' behaviour in predicting time and resources of activities and α-cut method in fuzzy logic theory is used as a measure of accepted risk level. In addition, the activities of project are crashed and penalty is induced for delay to make such problem realistic. The proposed model leads the managers to choose the Pareto optimal time-cost solutions under different risk levels as well as their associated degree of belief in a more flexible and realistic manner. Finally, this proposed model is used to solve a real problem. Copyright © 2013 Inderscience Enterprises Ltd.
引用
收藏
页码:153 / 170
页数:17
相关论文
共 50 条
  • [41] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [42] Multiproject Time-cost Trade-off Scheduling Problem for Large-scale Construction Systems under Fuzzy Uncertainty
    Ouyang Yong-liu
    Zhang Meng-xiang
    Han Lu
    Lu Yi
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING - 22ND ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2015, : 282 - 292
  • [43] Pareto Front Particle Swarm Optimizer for Discrete Time-Cost Trade-Off Problem
    Aminbakhsh, Saman
    Sonmez, Rifat
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (01)
  • [44] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [45] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [46] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [47] Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process
    Sadri, Shadi
    Ghomi, S. M. T. Fatemi
    Dehghanian, Amin
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 535 - 568
  • [48] Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off
    Yang, I-Tung
    Lin, Yu-Cheng
    Lee, Hsin-Yun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [49] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [50] Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
    Li, Hongbo
    Xu, Zhe
    Xiong, Li
    Liu, Yinbin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015