A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration

被引:0
|
作者
Parveen, Sultana [1 ]
Saha, Surajit Kumar [2 ]
机构
[1] Department of Industrial and Production Engineering, Bangladesh University of Engineering and Technology
[2] Titas Gas Transmission and Distribution Company Ltd., Dhaka-1215, 105, Kazi Nazrul Islam Avenue
关键词
Algorithm; CPM; Critical path method; Fuzzy set; Fuzzy time-resources trade-off; GA; Genetic algorithm; Multi-objective optimisation; TCTP; Time-cost trade-off problems;
D O I
10.1504/IJISE.2013.056094
中图分类号
学科分类号
摘要
The project managers' major concern is to complete project cost effectively and timely. But, in real life, the project completion time and cost may vary significantly as an effect of uncertainty such as weather, political and social disturbances, inflation, site congestion, human factors, productivity level, etc. Minimisation of project cost directly depends on proper utilisation of resources. Therefore, a GA-based fuzzy optimal model is proposed in this study incorporating multi-objective approach (MAWA) for project time-cost trade-off. In this study, fuzzy set theory is applied to model the managers' behaviour in predicting time and resources of activities and α-cut method in fuzzy logic theory is used as a measure of accepted risk level. In addition, the activities of project are crashed and penalty is induced for delay to make such problem realistic. The proposed model leads the managers to choose the Pareto optimal time-cost solutions under different risk levels as well as their associated degree of belief in a more flexible and realistic manner. Finally, this proposed model is used to solve a real problem. Copyright © 2013 Inderscience Enterprises Ltd.
引用
收藏
页码:153 / 170
页数:17
相关论文
共 50 条