Multi-objective flexible Job Shop scheduling with lot-splitting

被引:0
|
作者
Bai, Jun-Jie [1 ]
Gong, Yi-Guang [1 ]
Wang, Ning-Sheng [1 ]
Tang, Dun-Bing [1 ]
机构
[1] CIMS Research Centre, School of Machatronics, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:396 / 403
相关论文
共 50 条
  • [2] An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting
    Huang, Rong-Hwa
    Yu, Tung-Han
    APPLIED SOFT COMPUTING, 2017, 57 : 642 - 656
  • [3] Multi-objective integration of flexible collaborative planning and fuzzy flexible lot-splitting scheduling based on the Pareto optimal
    Bao, Zhenqiang
    Ren, Xiaoqing
    Yang, Yulu
    Zhu, Junwu
    Wang, Cheng
    Yin, Richao
    International Journal of Hybrid Information Technology, 2015, 8 (07): : 305 - 318
  • [4] Approach for Multi-objective Flexible Job shop scheduling
    Hui, Hongjie
    AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 407 - 410
  • [5] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [6] Particle swarm optimization with controllable diversity of flexible job-shop scheduling with lot-splitting production
    Qu, Xinhuai
    Liu, Dong
    Ding, Birong
    Jisuanji Fuzhu Sheji Yu Tuxingxue Xuebao/Journal of Computer-Aided Design and Computer Graphics, 2014, 26 (01): : 121 - 130
  • [7] Simulation Optimization of Multi-objective Flexible Job Shop Scheduling
    Wang Guicong
    Li Chuanpeng
    Cui Huanyong
    MACHINE DESIGN AND MANUFACTURING ENGINEERING II, PTS 1 AND 2, 2013, 365-366 : 602 - 605
  • [8] Multi-objective flexible job shop scheduling of batch production
    School of Mechatronic Engineering, Jinling Institute of Technology, Nanjing 210001, China
    不详
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (08): : 148 - 154
  • [9] A benchmark dataset for multi-objective flexible job shop cell scheduling
    Deliktas, Derya
    Ozcan, Ender
    Ustun, Ozden
    Torkul, Orhan
    DATA IN BRIEF, 2024, 52
  • [10] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS
    Zhang, Guo-Hui
    Dang, Shi-Jie
    Deng, Xiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952