Effects of project's physical characteristics on cost deviation in road construction

被引:0
|
作者
Mahamid, Ibrahim [1 ]
机构
[1] Civil Engineering Department, Hail University, Hail
关键词
Cost deviation; Cost overrun; Dummy variables; Physical characteristics; Road construction;
D O I
10.1016/j.jksues.2012.04.001
中图分类号
学科分类号
摘要
This study is conducted to investigate the effect of projects’ physical characteristics on cost deviation in road construction using data from road construction projects awarded in the West Bank – Palestine over the years 2007–2010. The study is based on a sample of 74 road construction projects. Based on these data, regression models are developed. A questionnaire survey is also conducted to determine the impact of projects’ physical characteristics on cost deviation in road construction. The questionnaire survey included 14 owners, 30 contractors, and 25 consultants. The considered characteristics are: project size (i.e. small, medium, and large), estimated cost, road length, road width, terrain conditions, soil and rock suitability, and soil and rock drill ability. The results reveal that the average of cost deviation in road construction is 16.73%, ranging from −20.33% to 56.01%. The correlation between cost deviation in road construction projects and the above mentioned parameters is investigated. © 2012
引用
收藏
页码:81 / 88
页数:7
相关论文
共 50 条
  • [1] Cost Diverge in Road Construction Activities as a Function of Project's Characteristics
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 926 - 929
  • [2] Environmental impacts and cost overrun derived from adjustments of a road construction project setting
    Pilger, Jackson Dullius
    Machado, Enio Leandro
    Lawisch-Rodriguez, Adriane de Assis
    Zappe, Ana Leticia
    Rodriguez-Lopez, Diosnel Antonio
    JOURNAL OF CLEANER PRODUCTION, 2020, 256
  • [3] ASSESSMENT OF DELAY AND COST-OVERRUN IN FEDERAL ROAD CONSTRUCTION PROJECT IN ABUJA
    Egila, Ashem Emmanuel
    Balogun, Oluwaseun Abdulakeem
    Yusuf, Saheed Olanrewaji
    INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2020, 11 (04): : 1184 - 1200
  • [4] Cost diviation in road construction projects: The case of Palestine
    Mahamid, Ibrahim
    Bruland, Amund
    CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (01): : 58 - 71
  • [5] The Computer Integrated Road Construction project
    Peyret, F
    Jurasz, J
    Carrel, A
    Zekri, E
    Gorham, B
    AUTOMATION IN CONSTRUCTION, 2000, 9 (5-6) : 447 - 461
  • [6] The Objective Evaluation of Road Construction Project
    Lin, Li
    Peng, Du
    Fei, Chai
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5224 - +
  • [7] Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
    Love, Peter E. D.
    Sing, Chun-Pong
    Carey, Brad
    Kim, Jeong Tai
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2015, 21 (02)
  • [8] Study on application of cost deviation principles to construction projects
    Qi Baoku
    Bai Shu
    Liu Guangchen
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 492 - 494
  • [9] Determinants of road construction project delay in the case of Woliso-Ambo road construction
    Berta, Kalkidan Kefale
    Tesfaye, Mesfin
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [10] Cost Overrun Causes in Road Construction Projects: "Consultants' Perspective"
    Mahamid, Ibrahim
    Bruland, Amund
    CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 6 - 10