共 15 条
- [1] Bai J., Yan X., Cheng L., Research on power flow and power source installation planning scheme during the 13th Five-Year period, Electric Power, 48, 1, pp. 15-20, (2015)
- [2] Qin Q., Guo Q., Zhou Q., Et al., The security and stability of power grids in 13th Five-Year planning and countermeasures, Electric Power, 48, 1, pp. 25-32, (2015)
- [3] Liu N., Tang X., Zhang W., Et al., Study on electromagnetic ring opening in Henan province under ultra-high voltage power grid, Power System Protection and Control, 39, 2, pp. 131-136, (2011)
- [4] Yao Y., Miao Y., Chen H., Et al., Research on electromagnetic looped network after Huainan-Shanghai UHV AC transmission system was put into operation, East China Electric Power, 42, 1, pp. 30-32, (2014)
- [5] Zhao Q., Liu Z., Zhang L., Discussions on the several problems of under-frequency load shedding scheme in China, Automation of Electric Power Systems, 34, 11, pp. 48-53, (2010)
- [6] Ma S., Yi J., Sun H., Et al., Study on configuration of under-voltage load shedding in power systems, Automation of Electric Power Systems, 33, 5, pp. 45-49, (2009)
- [7] Fang Y., Adaptive islanding control of power systems, Automation of Electric Power Systems, 31, 20, pp. 41-44, (2007)
- [8] Senroy N., Heydt G.T., A conceptual framework for the controlled islanding of interconnected power systems, IEEE Transactions on Power Systems, 21, 2, pp. 1005-1006, (2006)
- [9] Xu W., Dai S., Zhang Q., Et al., Comments and overviews on the islanding methods of large interconnected power grid, Proceedings of the CSEE, 35, 11, pp. 2756-2769, (2015)
- [10] Qin X., Ma S., Tang X., Et al., Study on power system out-of-step criterion based on WAMS, IEEE Power Engineering Society General Meeting, pp. 1-5, (2011)