共 50 条
- [41] Robust Multistage Yard Crane Scheduling in Container Terminals OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273
- [45] Yard Crane Scheduling with Real-time Reshuffle PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 225 - 230
- [47] A SIMULATION BASED HYBRID ALGORITHM FOR YARD CRANE DISPATCHING IN CONTAINER TERMINALS PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2230 - 2241
- [49] Simulation-based optimization model and metaheuristic solution of multiple crane scheduling problems 2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1469 - 1474