Optimization of crane scheduling in slab yard based on cycle simulation

被引:0
|
作者
机构
[1] Zhao, Ning
[2] Du, Yan-Hua
[3] Dong, Shao-Hua
[4] Li, Liang
来源
Zhao, N. | 1600年 / Systems Engineering Society of China卷 / 32期
关键词
Constrained optimization - Cranes - Steelmaking - Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Crane scheduling in slab yard is very important to tempo and efficiency of steel production. The optimization of crane scheduling is constrained by working zone, working process and crane interference. The process of optimization is affected by stochastic and whether the optimize result is satisfied is fuzzy. Cycle simulation is designed orienting this problem, thus optimization result can be got by multi-class fuzzy evaluation and cycle transform between as-is simulation model and to be simulation model. Agent technique is used to design simulation object in slab yard, simulation event and simulation logic are defined. An example of simulation application in a steel plant in China showed cycle simulation method is useful to crane scheduling in slab yard.
引用
收藏
相关论文
共 50 条
  • [41] Robust Multistage Yard Crane Scheduling in Container Terminals
    Marx, Tobias
    Hartisch, Michael
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273
  • [42] A hybrid parallel genetic algorithm for yard crane scheduling
    He, Junliang
    Chang, Daofang
    Mi, Weijian
    Yan, Wei
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2010, 46 (01) : 136 - 155
  • [43] Yard Crane Scheduling for container storage, retrieval, and relocation
    Galle, Virgile
    Barnhart, Cynthia
    Jaillet, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 288 - 316
  • [44] Yard Crane Scheduling in the Ground Trolley-Based Automated Container Terminal
    Yang, Xiao-Ming
    Jiang, Xin-Jia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2020, 37 (02)
  • [45] Yard Crane Scheduling with Real-time Reshuffle
    Man, Xiaoyi
    Zheng, Feifeng
    Chu, Feng
    Xu, Yinfeng
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 225 - 230
  • [46] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [47] A SIMULATION BASED HYBRID ALGORITHM FOR YARD CRANE DISPATCHING IN CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2230 - 2241
  • [48] Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem
    Rouky, Naoufal
    Abourraja, Mohamed Nezar
    Boukachour, Jaouad
    Boudebous, Dalila
    El Hilali Alaoui, Ahmed
    El Khoukhi, Fatima
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (01) : 111 - 132
  • [49] Simulation-based optimization model and metaheuristic solution of multiple crane scheduling problems
    Tamaki, H
    Kitamura, S
    Murao, H
    2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1469 - 1474
  • [50] Integrated Optimization on Double-Side Cantilever Yard Crane Scheduling and Green Vehicle Path Planning at U-Shaped Yard
    Peng, Wenhao
    Wang, Dujuan
    Qiu, Huaxin
    Chu, Feng
    Yin, Yunqiang
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2025, 26 (03) : 3684 - 3699