Geometrically nonlinear analysis of servo-control construction for large-span suspen-domes using double control method
被引:0
作者:
Liu, Huijuan
论文数: 0引用数: 0
h-index: 0
机构:
Key Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, ChinaKey Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, China
Liu, Huijuan
[1
]
Yang, Lüfeng
论文数: 0引用数: 0
h-index: 0
机构:
Key Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, ChinaKey Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, China
Yang, Lüfeng
[1
]
Luo, Yongfeng
论文数: 0引用数: 0
h-index: 0
机构:
College of Civil Engineering, Tongji University, Shanghai 200092, ChinaKey Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, China
Luo, Yongfeng
[2
]
机构:
[1] Key Lab. of Engineering Disaster Prevention and Structural Safety of the China Ministry of Education, Guangxi University, Nanning 530004, China
[2] College of Civil Engineering, Tongji University, Shanghai 200092, China
来源:
Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition)
|
2012年
/
40卷
/
03期
An incremental equilibrium equation was deduced for suspen-domes during prestress tension construction according to the theory of finite element method. Based on the equation, a servo-control construction method based on double control form-finding was proposed, taking the construction process and the friction of cable-strut joint into consideration, and the corresponding algorithm was established. By employing the algorithm, servo-control of the construction process can be realized and the configuration and cable force which agree with those in designed state respectively can be obtained with high accuracy. Servo-control of the construction process of an actual suspen-dome construction was studied, and the investigation shows the validity and practicability of the proposed algorithm. The method can also effectively control the construction process of the suspen-domes used in hoop-cable prestressing method.