共 47 条
- [1] THE ALIGNMENT CONTROL OF LARGE-SPAN CONTINUOUS BEAM BRIDGE CANTILEVER CONSTRUCTION METHOD ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1226 - 1230
- [2] Construction error control method of large-span spatial structures based on digital twin JOURNAL OF BUILDING ENGINEERING, 2024, 98
- [3] Mechanism and control method of large deformation for large-span chlorite schist tunnel Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2021, 21 (02): : 93 - 106
- [4] Research on Measure-control Technology of Large-span Suspendome during Construction Period VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT I, PTS 1-3, 2012, 105-107 : 2010 - +
- [5] Particleboard Hotpress Position Servo-control Using Fuzzy Self-tuning Method 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 4004 - 4009
- [6] Disturbance compensation for servo-control applications using a discrete adaptive neural network feedforward method PROCEEDINGS OF THE 46TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2007, : 1499 - 1506
- [7] The Construction Process Simulation of a Large-span Rhombic Space Truss Using FEM Analysis ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 1101 - 1104
- [8] Vibration control analysis of large-span steel structure floor under crowd load Zhendong Ceshi Yu Zhenduan/Journal of Vibration, Measurement and Diagnosis, 2013, 33 (03): : 514 - 520
- [9] Optimization of large-span metro station construction in soft rock strata and control of ground surface subsidence Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (04): : 804 - 813
- [10] Optimization analysis by key block theory for construction procedure of extra large-span double-arch tunnel Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (SUPPL. 1): : 2979 - 2985