Study of early warning mechanism of debris flow along railway line in mountainous areas

被引:0
作者
机构
[1] China Southwest Research Institute of China Railway Engineering Company Limited, Chengdu, 610031, Sichuan
来源
Li, Chaoan (lichaoan625@126.com) | 1600年 / Academia Sinica卷 / 33期
关键词
Debris flow; Engineering geology; Mountain railway line; Warning mechanism; Warning parameter;
D O I
10.13722/j.cnki.jrme.2014.s2.052
中图分类号
学科分类号
摘要
The paper analyzes the formation mechanism, the movement characteristics and the disaster mode of debris flow. Combine with the formation, movement and the disaster mechanism of the debris flow disaster along the mountain railway line, it considers the four parameters, such as the rainfall of the debris flow area, the rainfall infiltration depth of the source area, the infrasonic information and the ditch mud position as the key parameters of the debris flow disaster early warning in the mountains. Secondly, it establishes the debris flow early warning mechanism along the mountain railway line. According to the scale of itself and the characteristics of debris process, then combine the anti-disaster ability of railway itself, and from the railway safety requirements, it divides the debris flow disaster early warning of mountain railway line into four types, such as the prompt warning, the formation of early warning, the non-disaster early warning and the disaster warning. And establishing the critical value of early warning indicators, the system warning process and the distribution options for the key parameters from the four aspects which containing the drainage area rainfall, the rainfall infiltration depth of the source area, the infrasound and the ditch mud of debris flow. Finally, the paper introduces the test situation in the field of this monitoring and early warning system. Through the field test, it is found that it is feasible of this debris flow disaster warning method along the mountain railway line and it has good application prospects. ©, 2014, Academia Sinica. All right reserved.
引用
收藏
页码:3810 / 3816
页数:6
相关论文
共 11 条
  • [1] Li C., Study on automatic monitoring and early warning system of debris flow along railway line in mountainous area, (2012)
  • [2] Cai J., Shen J., Tang L., Development history of debris flows and its prediction in Toshiko gully, Journal of Bulletin of Soil and Water Conservation, 32, 3, pp. 217-221, (2012)
  • [3] Li C., Hu X., Li G., Et al., Formation mechanism of the 8·13catastrophic debris flow in Sichuan and the criterion prevention, Research of Soil and Water Conservation, 19, 2, pp. 257-263, (2012)
  • [4] Xu Q., The 13 August 2010 catastrophic debrisflow in Sichuan province: characteristics, geneticmechanism and suggestion, Journal of Engineering Geology, 18, 5, pp. 610-621, (2010)
  • [5] Wang L., The monitoring network system of real-time raining for mountainous railway line, Journal of Chinese Railways, 4, pp. 65-67, (2004)
  • [6] Tan B., Duan A., Study on prediction for rainstorm debris flow along mountainous district railways, Journal of Natural Disasters, 4, 2, pp. 43-52, (1995)
  • [7] Li C., The primary research of the forecast model of the source area's soil starting for the soil-mechanical debris flows, (2004)
  • [8] Zhang S., Yu N., Early warning system to debris flow, Journal of Mountain Science, 28, 3, pp. 379-384, (2010)
  • [9] Li C., Hu X., Wang L., Study on the debris flow mud-position automatic monitoring and early warning system for mountainous railway line, Journal of Natural Disasters, 20, 5, pp. 74-81, (2011)
  • [10] Tan B., Approached the Debris Flow, pp. 48-66, (2011)