共 50 条
- [43] Robust Optimisation for an Integrated Model of Berth and Quay Crane Assignment at Maritime Container Terminals Respecting Uncertain Numbers of Quay Cranes COMPUTATIONAL LOGISTICS, ICCL 2024, 2024, 15168 : 208 - 222
- [44] Coordinated Scheduling of Berth and Quay Crane Based on MAS IITAW: 2009 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATIONS WORKSHOPS, 2009, : 328 - 331
- [45] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
- [47] An Integration Optimization for Berth Allocation and Quay Crane Scheduling Method Based on The Genetic and Ant Colony Algorithm ADVANCES IN TRANSPORTATION, PTS 1 AND 2, 2014, 505-506 : 940 - +
- [48] A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals Flexible Services and Manufacturing Journal, 2021, 33 : 1 - 42
- [50] A Simultaneous Integrated Model With Multiobjective For Continuous Berth Allocation And Quay Crane Scheduling Problem 2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,