Mobile base station site as a virtual power plant for grid stability

被引:0
|
作者
Laimio, Jussi [1 ,5 ]
Keski-Heikkila, Mika [1 ,3 ]
Parssinen, Matti [1 ,3 ]
Lahti, Roope [3 ]
Salmela, Olli [2 ]
Volkov, Topi [2 ]
Collin, Jari [3 ]
Rannikko, Petri [3 ]
Koskela, Henri [4 ]
Manner, Jukka [1 ]
机构
[1] Aalto Univ, Dept Commun & Networking, POB 15500, Aalto 00076, Finland
[2] Nok Oyj, Karakaari 13, Espoo 02610, Finland
[3] Telia Finland Oyj, Pasilan Asema aukio 1, Helsinki 00520, Finland
[4] Etteplan Oyj, Tekniikantie 4, Espoo 02150, Finland
[5] Virnex Grp Oyj, Askonkatu 9, Lahti 15110, Finland
关键词
Battery backup; Distributed Energy Resources; Power grid; Reserve products; Virtual power plant; Fast Frequency Reserve; Mobile Networks;
D O I
10.1016/j.ijepes.2024.110390
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Energy grids and markets are in transition. Increased use of renewable energy sources (RES) introduces new stability challenges for power grids. Despite the substantial electrical consumption of mobile networks, they are yet to harness their inherent flexibility for aiding in the stability of the power grid. A noticeable research gap exists concerning measuring full activation time for fast frequency reserve (FFR) product while using batteries from mobile network base stations. Our objective is to demonstrate that mobile operators could use their existing infrastructure to participate in the reserve market of a contemporary power grid. Furthermore, it seeks to determine if the full activation time can meet the requirements of an FFR product. The system consists of a live mobile base station site with a mobile connection to the site, local controller, an existing battery, and a power system that, in combination, can function as part of a power grid balancing system. Our main finding indicates that the rectifier reaction time within an installed base station site infrastructure ranges from 5 to 8 s, and the time when the base station is entirely off from the grid varies from 7 to 10 s. This finding is significant since the activation time is too long for the base station power system controller to be used for FFR. The required full activation time for FFR is less than 1.3 s. In conclusion, power system vendors should investigate improvements for their equipment and software products to enable fast reserve market entry for their existing customers and stay competitive.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Impact of Virtual Inertia on DC Grid Stability With Constant Power Loads
    Tu, Hao
    Yu, Hui
    Lukic, Srdjan
    IEEE TRANSACTIONS ON POWER ELECTRONICS, 2023, 38 (05) : 5693 - 5699
  • [42] MOBILE POWER-STATION
    不详
    ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1973, 25 (09): : 225 - 225
  • [43] On the Self-Scheduling of Cellular Base Station-Based Virtual Power Plants
    Yong, Pei
    Yang, Zhifang
    Zhang, Ning
    Kang, Chongqing
    IEEE INTERNET OF THINGS JOURNAL, 2024, 11 (14): : 24511 - 24522
  • [44] Multi-objective Optimization Algorithm Design and Implementation of Mobile Base Station Site Selection
    Wang, Min
    Tang, Jun
    APPLIED MECHANICS AND MECHANICAL ENGINEERING, PTS 1-3, 2010, 29-32 : 2496 - +
  • [45] Determination of Base Station Emission Power Change in a Mobile Network Cell with Movable Users
    Lebl, Aleksandar
    Mitic, Dragan
    Trenkic, Branimir
    Markov, Zarko
    RADIOENGINEERING, 2018, 27 (04) : 1174 - 1182
  • [46] Power supply solutions and trends analysis for Small Cell mobile communication base station
    Liu, Mingming
    Hu, Xianhong
    Liu, Liangliang
    Wang, Zhen
    2018 IEEE INTERNATIONAL TELECOMMUNICATIONS ENERGY CONFERENCE (INTELEC), 2018,
  • [47] Research on the operating mode of the Power supply for a Telecom Base Station Based on the Peak & Valley Model of the Power Grid
    Zhang, Shaomin
    Wang, Pengchao
    Liu, Mingming
    Cheng, Zhirong
    2017 IEEE INTERNATIONAL TELECOMMUNICATIONS ENERGY CONFERENCE (INTELEC), 2017, : 515 - 520
  • [48] Virtual Base Station Algorithm and Performance Assessment
    Saidani, M.
    Sarri, P.
    Guinamard, A.
    Maya, D. Gallego
    PROCEEDINGS OF THE 33RD INTERNATIONAL TECHNICAL MEETING OF THE SATELLITE DIVISION OF THE INSTITUTE OF NAVIGATION (ION GNSS+ 2020), 2020, : 2696 - 2709
  • [49] BASE AND MOBILE STATION ANTENNAS FOR LAND MOBILE RADIO SYSTEMS
    YAMADA, Y
    EBINE, Y
    TSUNEKAWA, K
    IEICE TRANSACTIONS ON COMMUNICATIONS ELECTRONICS INFORMATION AND SYSTEMS, 1991, 74 (06): : 1547 - 1555
  • [50] Potentials of Optimized Hybrid System in Powering Off-Grid Macro Base Transmitter Station Site
    Anayochukwu, Ani Vincent
    Ndubueze, Nzeako Anthony
    INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH, 2013, 3 (04): : 861 - 871