Mobile base station site as a virtual power plant for grid stability

被引:0
|
作者
Laimio, Jussi [1 ,5 ]
Keski-Heikkila, Mika [1 ,3 ]
Parssinen, Matti [1 ,3 ]
Lahti, Roope [3 ]
Salmela, Olli [2 ]
Volkov, Topi [2 ]
Collin, Jari [3 ]
Rannikko, Petri [3 ]
Koskela, Henri [4 ]
Manner, Jukka [1 ]
机构
[1] Aalto Univ, Dept Commun & Networking, POB 15500, Aalto 00076, Finland
[2] Nok Oyj, Karakaari 13, Espoo 02610, Finland
[3] Telia Finland Oyj, Pasilan Asema aukio 1, Helsinki 00520, Finland
[4] Etteplan Oyj, Tekniikantie 4, Espoo 02150, Finland
[5] Virnex Grp Oyj, Askonkatu 9, Lahti 15110, Finland
关键词
Battery backup; Distributed Energy Resources; Power grid; Reserve products; Virtual power plant; Fast Frequency Reserve; Mobile Networks;
D O I
10.1016/j.ijepes.2024.110390
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Energy grids and markets are in transition. Increased use of renewable energy sources (RES) introduces new stability challenges for power grids. Despite the substantial electrical consumption of mobile networks, they are yet to harness their inherent flexibility for aiding in the stability of the power grid. A noticeable research gap exists concerning measuring full activation time for fast frequency reserve (FFR) product while using batteries from mobile network base stations. Our objective is to demonstrate that mobile operators could use their existing infrastructure to participate in the reserve market of a contemporary power grid. Furthermore, it seeks to determine if the full activation time can meet the requirements of an FFR product. The system consists of a live mobile base station site with a mobile connection to the site, local controller, an existing battery, and a power system that, in combination, can function as part of a power grid balancing system. Our main finding indicates that the rectifier reaction time within an installed base station site infrastructure ranges from 5 to 8 s, and the time when the base station is entirely off from the grid varies from 7 to 10 s. This finding is significant since the activation time is too long for the base station power system controller to be used for FFR. The required full activation time for FFR is less than 1.3 s. In conclusion, power system vendors should investigate improvements for their equipment and software products to enable fast reserve market entry for their existing customers and stay competitive.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Stability Analysis of Virtual Power Plant with Grid Forming Converters
    Tozak, Macit
    Taskin, Sezai
    Sengor, Ibrahim
    Hayes, Barry P.
    2024 INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES, SEST 2024, 2024,
  • [2] Power Saving Model for Mobile Device and Virtual Base Station in the 5G Era
    Mushtaq, M. Sajid
    Fowler, Scott
    Mellouk, Abdelhamid
    2017 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2017,
  • [3] Research on decentralized resource operation optimization of virtual power plant with 5G base station
    Ma, Dongjuan
    Liu, Zehui
    Guo, Min
    Jing, Weizhe
    Jing, Feng
    Li, Rui
    Yang, Hua
    Zheng, Huiping
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2024, 19 : 1124 - 1137
  • [4] A Working Method for Mobile Station in Nuclear Power Plant
    Zhu, Bin
    2013 NINTH INTERNATIONAL CONFERENCE ON INTELLIGENT INFORMATION HIDING AND MULTIMEDIA SIGNAL PROCESSING (IIH-MSP 2013), 2013, : 652 - 654
  • [5] Analysis of satellite solar power station as base load power plant
    Kumar, Deepak
    Chaudhary, Kalpana
    2016 IEEE UTTAR PRADESH SECTION INTERNATIONAL CONFERENCE ON ELECTRICAL, COMPUTER AND ELECTRONICS ENGINEERING (UPCON), 2016, : 551 - 556
  • [6] Power Savings in Mobile Networks by Dynamic Base Station Sectorization
    Hevizi, Laszlo G.
    Godor, Istvan
    2011 IEEE 22ND INTERNATIONAL SYMPOSIUM ON PERSONAL INDOOR AND MOBILE RADIO COMMUNICATIONS (PIMRC), 2011, : 2415 - 2417
  • [7] Transient Stability of the Grid with a Wind Power Plant
    Muljadi, E.
    Nguyen, T. B.
    Pai, M. A.
    2009 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION, VOLS 1-3, 2009, : 312 - +
  • [8] Decomposition of Stochastic Power Management for Wireless Base Station in Smart Grid
    Kaewpuang, Rakpong
    Niyato, Dusit
    Wang, Ping
    IEEE WIRELESS COMMUNICATIONS LETTERS, 2012, 1 (02) : 97 - 100
  • [9] Optimal Control of 5G Base Station Virtual Power Plant Based on Customer Directrix Load
    Li J.
    Zhang P.
    Zhao J.
    Fan S.
    He G.
    Dianwang Jishu/Power System Technology, 2024, 48 (06): : 2356 - 2365
  • [10] Power Allocation of Base Station System Based on Smart Grid RTP
    Li, Baogang
    2014 IEEE 7TH INTERNATIONAL CONFERENCE ON ADVANCED INFOCOMM TECHNOLOGY (ICAIT), 2014, : 56 - 61