Project reliability evaluation of a restaurant under time constraints and customer demands

被引:0
作者
Lin, Yi-Kuei [1 ]
Chen, Sheng-Chiang [2 ]
Hsueh, Kai-Jen [1 ]
机构
[1] Department of Industrial Management, National Taiwan University of Science and Technology, Taipei
[2] Institute of Management, National Taiwan University of Science and Technology, Taipei
来源
International Journal of Information and Management Sciences | 2015年 / 26卷 / 04期
关键词
Duration distribution; Project network; Project reliability; Restaurant; Work breakdown structure;
D O I
10.6186/IJIMS.2015.26.4.1
中图分类号
学科分类号
摘要
Every restaurant strives to maintain the quality of its service while simultaneously attracting new customers. Thus, restaurant managers face the dual challenges of adhering to time constraints and fulfilling customer demands. To investigate this issue in the present study, cooking was regarded as a project and was analyzed using a work breakdown structure. Since many real-world projects can be described by network models using axes and nodes, we also evaluated restaurant performance by analyzing its project network. In general, a project network mainly consists of activities, and in this case, the capacity of each cooking appliance and the duration of each activity involved in the cooking process were also accounted for in the calculations. The main purpose of this study was to evaluate the project reliability, the probability that a restaurant can produce a demanded number of meals within a certain time. A restaurant multistate project network (RMPN) was constructed based on information provided by a restaurant about the cooking process. We then measured the time spent on each activity to generate the duration distribution. An algorithm was subsequently developed to assess the project reliability of the RMPN. This algorithm can be used by restaurant managers to assess the service qualities of their restaurants.
引用
收藏
页码:323 / 340
页数:17
相关论文
共 44 条
  • [1] Aggarwal K.K., Chopra Y.C., Bajwa J.S., Capacity consideration inreliability analysis of communication systems, IEEE Transaction Reliability, 31, 2, pp. 177-180, (1982)
  • [2] Aven T., Reliability evaluation ofmultistate systems with component, IEEE Transactions on Reliability, 34, pp. 473-479, (1985)
  • [3] Bendavid I., Golany B., Predetermined intervals for start times of activities in the stochastic project scheduling problem, Annals of Operations Research, 186, pp. 429-442, (2011)
  • [4] Bruni M.E., Guerriero F., Pinto E., Evaluating project completion time in project networks with discrete random activity durations, Computers and Operations Research, 36, pp. 2716-2722, (2009)
  • [5] Cheng C.C., Chen C.T., Hsu F.S., Hu H.Y., Enhancing service quality improvement strategies of fine-dining restaurants: New insights from integrating a two-phase decisionmaking model of IPG A and DEMATEL analysis, International Journal of Hospitality Management, 31, 4, (2012)
  • [6] Clancy D.P., Gross G., Wu F.F., Probability flows for reliability evaluation of -multi area power system interconnections, International Journal of Electrical Power & Energy Systems, 5, 2, pp. 100-114, (1983)
  • [7] Gido J., Clements J.P., Successful Project Management, (1999)
  • [8] Golenko-Ginzburg D., Gonik A., Stochastic network project scheduling with non- consumable limited resources, International Journal of Production Economics, 48, pp. 29-37, (1997)
  • [9] Griffith W.S., Multistate reliability models, Journal of Applied Probability, 17, pp. 735-744, (1980)
  • [10] Ha J., Jang S.C.S., Effects of service quality and food quality: The moderating role of atmospherics in an ethnic restaurant segment, International Journal of Hospitality Management, 29, (2010)