Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation

被引:0
|
作者
Zhao, Yan-Xi [1 ,2 ]
Xu, Wei-Ya [1 ,2 ]
机构
[1] Key Laboratory for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, China
[2] Geotechnical Research Institute, Hohai University, Nanjing 210098, China
来源
Yantu Lixue/Rock and Soil Mechanics | 2009年 / 30卷 / 03期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:793 / 798
相关论文
共 50 条
  • [1] Risk Assessment on Enterprise Resource Planning Based on AHP and Fuzzy Synthetic Evaluation
    Wu Hongxia
    Wang Guangfeng
    COMPREHENSIVE EVALUATION OF ECONOMY AND SOCIETY WITH STATISTICAL SCIENCE, 2010, : 106 - 110
  • [2] Construction Projects Risk Assessment based on Fuzzy AHP
    Gohar, A. Sotoodeh
    Khanzadi, M.
    Jalal, M. Parchami
    Javid, A. A. Shirzadi
    2009 IEEE STUDENT CONFERENCE ON RESEARCH AND DEVELOPMENT: SCORED 2009, PROCEEDINGS, 2009, : 570 - 573
  • [3] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation
    Zhang Xi-rong
    Li Zhi
    Shen Yao-jie
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
  • [4] Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method
    Zheng, Xin
    Ma, Fenghai
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1243 - 1248
  • [5] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [6] Risk assessment based on fuzzy synthetic evaluation method
    Akter, Marin
    Jahan, Momtaz
    Kabir, Rubaiya
    Karim, Dewan Sadia
    Haque, Anisul
    Rahman, Munsur
    Salehin, Mashfiqus
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 658 : 818 - 829
  • [7] Risk assessment of high-speed railway tunnel construction based on fuzzy synthetic evaluation
    Wu, Li
    Zhang, Lianggang
    Lai, Yun
    Chen, Jian
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1251 - 1256
  • [8] Risk assessment model in TBM construction based on nonlinear fuzzy analytic hierarchy process
    Song Zhan-ping
    Guo De-sai
    Xu Tian
    Hua Wei-xiong
    ROCK AND SOIL MECHANICS, 2021, 42 (05) : 1424 - 1433
  • [9] Risk assessment in Tunnel Portal based on Fuzzy AHP Comprehensive Evaluation
    Huang Lei
    Huang Xieqin
    2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 692 - 696
  • [10] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rezai, Bahram
    Rostami, Jamal
    Bejari, Hadi
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 69 (04) : 523 - 532