共 14 条
- [1] Nasir D, McCabe B, Hartono L, Evaluating risk in construction-schedule (ERIC-S): Construction schedule risk model, Journal of Construction Engineering and Management, 129, 5, pp. 518-527, (2003)
- [2] Su Dongye, Robert L, NPV-at-risk method in infrastructure project investment evaluation, Journal of Construction Engineering and Management, 126, 3, pp. 227-233, (2000)
- [3] Qiao WF, Zhang DS, Lei L, Risk analysis of real estate investment based on computer simulation, Journal of Wuhan University of Technology, 26, 8, pp. 100-102, (2004)
- [4] Wang GY, Chen JG, Dong YX, An analytic and application to multi-objective decision making on venture investment in estate, Mathematics in Practice and Theory, 33, 5, pp. 26-29, (2003)
- [5] Mei CS, Et al., Risk analysis of construction project, Project Design and Construction, 164, 6, pp. 38-40, (2000)
- [6] Huang FN, Basic theory of risk analysis of real estate investment, Journal of Harbin University of C E & Architecture, 30, 1, pp. 55-57, (1997)
- [7] Shi JL, Calculation of the risk of net present value in real estate investment by normal distribution graphics, Journal of Shanghai University, 30, 5, pp. 500-505, (1998)
- [8] Chen LW, (2004)
- [9] Zhang XX, Discussion about risk factors in real estate investment, Zhejiang Architecture, 85, 3, pp. 47-48, (1998)
- [10] Zhou XH, Zhou LY, The real estate risk and prevention, Journal of Harbin University of C E & Architecture, 31, 5, pp. 91-95, (1998)