Study on stress corrosion behavior and failure mechanism of galvanized bolts in complex coal mine environments

被引:0
|
作者
He, Zhe [1 ]
Zhang, Nong [1 ,2 ]
Xie, Zhengzheng [1 ]
Ma, Chao [2 ]
Han, Changliang [1 ]
Zhang, Fan [3 ]
Wang, Huiqing [4 ]
Alarifi, Saad S. [5 ]
机构
[1] China Univ Min & Technol, Sch Mines, State Key Lab Coal Explorat & Intelligent Min, Xuzhou 221116, Peoples R China
[2] Xuzhou Univ Technol, Sch Civil Engn, Xuzhou 221116, Peoples R China
[3] China Univ Min & Technol, Sch Mat Sci & Phys, Xuzhou 221116, Peoples R China
[4] Shandong Yanxin Min Mat Proc Co LTD, Shandong Energy Grp, Xintai 271200, Peoples R China
[5] King Saud Univ, Coll Sci, Dept Geol & Geophys, Riyadh 11451, Saudi Arabia
来源
JOURNAL OF MATERIALS RESEARCH AND TECHNOLOGY-JMR&T | 2025年 / 34卷
基金
中国国家自然科学基金;
关键词
SCC; HIC; Micro-scale characterization; Failure mechanism; Galvanized bolts; High mineralization mine water; CABLE BOLTS; ROCK BOLT; CRACKING; STEEL; ROCKBOLTS;
D O I
10.1016/j.jmrt.2024.12.173
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The premature failure of bolts caused by stress corrosion cracking (SCC) is a common issue in the global mining industry. Studies have shown that hot-dip galvanizing is an effective solution, but the first widespread application of galvanized bolts in Xin'Shang'Hai No. 1 coal mine, China, experienced extensive failures. To thoroughly investigate the fracture failure mechanism, this paper employed a comprehensive approach that included macro mechanical property testing, corrosion experiments, and micro-scale characterization. The findings indicate that significant stress concentration occurred on the surface threads of the bolts under high mine pressure, serving as the primary inducer of SCC in the bolts. Under long-term stress corrosion conditions, the peak strength of high-strength coated bolts, hot-dip galvanized bolts, and ordinary bolts decreased by 3.73%, 20.54%, and 11.60% respectively. Among them, the coated bolts largely maintained their original mechanical properties and had the best anti-corrosion capability. The performance of galvanized bolts deteriorated more than ordinary ones, indicating that they could not suppress the SCC of the bolts and even exacerbated the SCC of the bolt body after the galvanized layer cracked. Hydrogen content analysis showed that after service in the mine, the hydrogen content in the body of the galvanized bolts increased by 304.48%, significantly raising the risk of hydrogen induced cracking (HIC). Additionally, HIC-sensitive structures (tempered martensite) and typical features of HIC (white spots) were found in the galvanized bolts, providing strong evidence of HIC occurrence during their service in the mine. In short, the instantaneous fracture of galvanized bolts was mainly caused by the interaction of stress concentration cracking due to the geometry of the bolts and HIC under stress corrosion failure. Thus, in deep underground engineering, it is not recommended to promote the use of galvanized anti-corrosion processes and Class A shaped bolts, especially in environments with high stress and high mineralization. Instead, high-strength coated bolts are advised to replace galvanized ones to enhance the reliability and safety of bolt support.
引用
收藏
页码:1759 / 1776
页数:18
相关论文
共 50 条
  • [22] Failure mechanism of pump chambers and their optimized design in deep mining at Qishan Coal Mine
    Sun X.
    Wu C.
    Cai F.
    Mining Science and Technology, 2010, 20 (06): : 825 - 830
  • [23] Double Peaked Stress–Strain Behavior and Progressive Failure Mechanism of Encased Coal Pillars Under Uniaxial Compression
    Chunwang Zhang
    Zhixin Jin
    Guorui Feng
    Xuanmin Song
    Gao Rui
    Zhang yujiang
    Rock Mechanics and Rock Engineering, 2020, 53 : 3253 - 3266
  • [24] The Influence and Mechanism of Residual Stress on the Corrosion Behavior of Welded Structures
    Bai, Linyue
    Jiang, Kebin
    Gao, Lei
    MATERIALS RESEARCH-IBERO-AMERICAN JOURNAL OF MATERIALS, 2018, 21 (05):
  • [25] Back-calculation of failure stress of rockbolts affected by Stress Corrosion Cracking in underground coal mines
    Vandermaat, D.
    Saydam, S.
    Hagan, P. C.
    Crosky, A. G.
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2017, 100 : 310 - 317
  • [26] Double Peaked Stress-Strain Behavior and Progressive Failure Mechanism of Encased Coal Pillars Under Uniaxial Compression
    Zhang, Chunwang
    Jin, Zhixin
    Feng, Guorui
    Song, Xuanmin
    Rui, Gao
    Zhang Yujiang
    ROCK MECHANICS AND ROCK ENGINEERING, 2020, 53 (07) : 3253 - 3266
  • [27] Stress corrosion testing of roof bolt grade 60 steel in simulated underground coal mine atmosphere
    Bylapudi, Gopi
    Spearing, A. J. S.
    Mondal, Kanchan
    Bhagwat, Anand
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2019, 128 (04) : 206 - 215
  • [28] Experimental Study on the Mechanical Behavior of Rock Bolts Subjected to Complex Static and Dynamic Loads
    Kang, Hongpu
    Yang, Jinghe
    Gao, Fuqiang
    Li, Jianzhong
    ROCK MECHANICS AND ROCK ENGINEERING, 2020, 53 (11) : 4993 - 5004
  • [29] Experimental Study on the Mechanical Behavior of Rock Bolts Subjected to Complex Static and Dynamic Loads
    Hongpu Kang
    Jinghe Yang
    Fuqiang Gao
    Jianzhong Li
    Rock Mechanics and Rock Engineering, 2020, 53 : 4993 - 5004
  • [30] Surface structure characterization and corrosion mechanism study of three types hot-dip galvanized spangles
    Zhang, Shaoshuang
    Liang, Yuanyuan
    Song, Renbo
    Feng, Beijia
    Wang, Yimin
    MATERIALS CHARACTERIZATION, 2024, 212