共 50 条
- [41] Earned value project management of model-centric software development 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12694 - 12697
- [43] Implementation and Evaluation of Earned Value Index to Achieve an Accurate Project Time and Cost Estimation and Improve "Earned Value Management System" 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT AND ENGINEERING, PROCEEDINGS, 2009, : 312 - 316
- [44] The research on optimization of earned value management method in engineering budget management Open Civ. Eng. J., 1 (369-375):
- [45] A Study on Earned Value Method for Uncertain Parameters in Project Integration Control PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 1500 - 1505
- [46] The research on optimization of earned value management method in engineering budget management Open Civil Engineering Journal, 2015, 9 (01): : 369 - 375
- [48] Earned value analysis for software project based on function point method PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 301 - 308
- [49] The application, modification & extension of earned value management in construction projects Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 955 - 958