Application of improved earned value method in project management processes

被引:0
|
作者
Qiao, Li-Hong [1 ]
Guo, Guang-Xin [1 ]
Yang, Zhi-Bing [2 ]
机构
[1] School of Mechanical Engineering and Automation, Beihang University, Beijing 100191, China
[2] School of Mechanical Engineering, Beijing Institute of Technology, Beijing 100081, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:33 / 36
相关论文
共 50 条
  • [31] Study on project management of railway engineering project base on earned value analysis
    Lizeng, Li
    Tongyin, Han
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 405 - 407
  • [32] Earned Value Project Management, 4th Edition
    Rose, Kenneth H.
    PROJECT MANAGEMENT JOURNAL, 2011, 42 (03) : 103 - 103
  • [33] Application of Improved Critical Chain and Earned Value Technique in Software Engineering & Integrated Project Progress Control
    Ma, Chengqian
    Hu, Weitao
    Deng, Yayin
    2019 IEEE 9TH SYMPOSIUM ON COMPUTER APPLICATIONS & INDUSTRIAL ELECTRONICS (ISCAIE), 2019, : 136 - 142
  • [34] Project review in the project management: an investigation study on earned value and balanced scorecard
    Eleyan, Derar
    El-Sawalhi, Nabil
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2010, 13 (06): : 1187 - 1209
  • [35] Application of Earned Value Method for evaluation the Time/Cost Consequences of Variation Orders in a Construction Project
    Czemplik, Andrzej
    WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2017, 245
  • [36] A Process-Improvement Method for Implementing Earned Value-Based Project Management in Organizations
    Panquet, Quentin
    Bourgault, Mario
    Pellerin, Robert
    Danjou, Christophe
    Perrier, Nathalie
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (12)
  • [37] RESEARCH ON THE EARNED VALUE MANAGEMENT SYSTEM APPLIED IN CONSULTANCY PROJECT PERFORMANCE
    Tserng, H. Ping
    Lin, Wen-Shyong
    Li, Chien-Chung
    Weng, Kai-Wei
    Loisel, Denise C.
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2015, 23 (01): : 21 - 35
  • [38] "KAIZEN" (Improvement) in Spacecraft Project Management using "Earned Value Analysis"
    Lakshman, Deepti
    Kannan, M. V.
    Bhojraj, H.
    JOURNAL OF SPACECRAFT TECHNOLOGY, 2011, 21 (01): : 21 - 30
  • [39] Project cost forecasting based on earned value management and Markov chain
    Damavandi, Majid
    Tavakoli, Mahdieh
    Jolai, Fariborz
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [40] Using the Earned Value Management System to Improve Electrical Project Control
    Hanna, Awad S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (03): : 449 - 457