共 36 条
- [31] Analysis of open cut method and local cover-excavation method in subway station construction Electronic Journal of Geotechnical Engineering, 2015, 20 (04): : 1483 - 1493
- [34] Analysis of rigid pile-raft composite foundation long-term deformation characteristic and control post-construction settlement of high-speed railway 1600, CAFET INNOVA Technical Society, 1-2-18/103, Mohini Mansion, Gagan Mahal Road,, Domalguda, Hyderabad, 500029, India (07):
- [35] Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 243 - 250
- [36] Assessment and control analysis of impact of open cut foundation pit excavation on adjacent high speed railway shield tunnel Electronic Journal of Geotechnical Engineering, 2015, 20 (14): : 6131 - 6141