Data-driven continuous-time framework for frequency-constrained unit commitment

被引:0
作者
Rajabdorri, Mohammad [1 ]
Lobato, Enrique [1 ]
Sigrist, Lukas [1 ]
Aghaei, Jamshid [2 ]
机构
[1] Univ Pontificia Comillas, Escuela Tecn Super Ingn ICAI, Inst Invest Tecnol IIT, Madrid, Spain
[2] Cent Queensland Univ, Sch Engn & Technol, Rockhampton, Qld, Australia
关键词
Frequency-constrained unit commitment; Continuous-time formulation; Data-driven frequency nadir; Start-up and shut-down trajectories; Bernstein polynomials; MIP FORMULATION; GENERATION;
D O I
10.1016/j.ijepes.2024.110327
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The conventional approach to solving the unit commitment problem involves discrete intervals at an hourly scale, particularly when integrating frequency dynamics to formulate a frequency-constrained unit commitment. To overcome this limitation, a novel continuous-time frequency-constrained unit commitment framework is proposed in this paper. In this approach, Bernstein polynomials represent continuous variables in the unit commitment problem and enable the calculation of frequency response-related metrics such as the rate of change of frequency, quasi-steady-state frequency, and frequency nadir, and the corresponding continuous-time constraints are introduced. Notably, startup and shut-down trajectories are meticulously considered, transforming the formulation into a fully continuous-time model and simplifying constraints related to variable continuity. To address the complexities associated with integrating the obtained non-linear frequency nadir constraint into a mixed-integer linear problem, an alternative data-driven frequency nadir constraint is proposed, which accurately constrains frequency nadir deviations throughout the time interval. To validate the proposed model, it is applied to the real-life network of the Spanish Island of La Palma. The data-driven method for estimating frequency nadir has demonstrated a minimum accuracy of 99.61% and has consistently maintained the frequency above the defined threshold.
引用
收藏
页数:11
相关论文
共 34 条
[1]  
[Anonymous], 2023, Gurobi Optimizer Reference Manual
[2]   Simultaneous Scheduling of Multiple Frequency Services in Stochastic Unit Commitment [J].
Badesa, Luis ;
Teng, Fei ;
Strbac, Goran .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2019, 34 (05) :3858-3868
[3]   Continuous-time look-ahead flexible ramp scheduling in real-time operation [J].
Bagherinezhad, Avishan ;
Khatami, Roohallah ;
Parvania, Masood .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 119
[4]  
CAISO S, 2022, Business practice manual for market operations
[5]  
Dierckx P., 1996, Curve and Surface Fitting with Splines
[6]   Inclusion of frequency stability constraints in unit commitment using separable programming* [J].
Ferrandon-Cervantes, C. J. ;
Kazemtabrizi, Behzad ;
Troffaes, Matthias C. M. .
ELECTRIC POWER SYSTEMS RESEARCH, 2022, 203
[7]   A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints [J].
Gentile, C. ;
Morales-España, G. ;
Ramos, A. .
EURO Journal on Computational Optimization, 2017, 5 (1-2) :177-201
[8]   Robust allocation of distributed energy storage systems considering locational frequency security [J].
Han, Rushuai ;
Hu, Qinran ;
Zhang, Hongcai ;
Ge, Yi ;
Quan, Xiangjun ;
Wu, Zaijun .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 157
[9]   A novel hybrid model based on nonlinear weighted combination for short-term wind power forecasting [J].
Jiandong, Duan ;
Peng, Wang ;
Wentao, Ma ;
Shuai, Fang ;
Zequan, Hou .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2022, 134
[10]   Coordinative frequency-constrained unit commitment model for HVDC interconnected AC systems [J].
Jiang, Sufan ;
Wu, Chuanshen ;
Gao, Shan ;
Pan, Guangsheng ;
Wang, Sicheng ;
Liu, Yu ;
Zhao, Xin .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2022, 141