共 50 条
- [1] Research on Critical Chain Identification Methods of Project Schedule Management in China 2018 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MANAGEMENT SCIENCE AND ENGINEERING (AMSE 2018), 2018, 292 : 75 - 78
- [2] Fuzzy optimization of construction engineering project schedule based on critical chain management Liu, J. (Liujb71@sina.cn), 2013, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [3] Research on the Application of information technology in Engineering Project Management INTERNATIONAL SYMPOSIUM 2017 - MECHANICAL AND ELECTRONICAL SYSTEMS AND CONTROL ENGINEERING, 2017, : 76 - 79
- [4] Research on Software Project Schedule Based on Critical Chain 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
- [5] PROJECT SCHEDULE MANAGEMENT BASED ON CRITICAL CHAIN METHOD ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 269 - 273
- [6] The application and research of Markov Chain in schedule prediction of IT project PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2152 - 2156
- [7] Critical chain, project schedule management based on Bayesian Network model Tongji Daxue Xuebao, 10 (1606-1612):
- [8] Research on Practical Application of Big Data Mining Technology in Engineering Project Management PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY AND ECONOMIC MANAGEMENT, 2015, 22 : 53 - 60
- [9] Study on the Schedule Management Methods of Projects Based on Critical Chain Technology MATERIALS SCIENCE, CIVIL ENGINEERING AND ARCHITECTURE SCIENCE, MECHANICAL ENGINEERING AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2014, 488-489 : 1454 - +
- [10] RESEARCH ON CRITICAL CHAIN MANAGEMENT AND RISK MANAGEMENT IN PROJECT IMPLEMENTATION MANAGEMENT ICEIS 2011: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 2, 2011, : 351 - 356