共 50 条
- [1] Erection control of main girder of steel box girder cable-stayed bridge with separated decks and asymmetric cable planes Jia, S.-M. (jiashaomin1@163.com), 1600, Wuhan Bridge Research Institute (44):
- [2] The Technology of Stay Cables Erection for Twin Towers Steel Box Truss Girder Cable-stayed Bridge Journal of Railway Engineering Society, 2019, 36 (05): : 37 - 40
- [3] Local mechanical behavior of flat steel box girder for kilometer-level cable-stayed bridge Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2010, 43 (07): : 593 - 600
- [6] Model test for fatigue performance of anchorage in cable-stayed bridge with steel box girder Gongcheng Lixue, 2007, 8 (127-132): : 127 - 132
- [7] Model test for fatigue performance of anchorage in cable-stayed bridge with steel box girder ENGINEERING STRUCTURAL INTEGRITY: RESEARCH, DEVELOPMENT AND APPLICATION, VOLS 1 AND 2, 2007, : 859 - 861
- [8] Mechanical property of cable-pylon anchorage zone of cable-stayed bridge with steel box girder Zongguo Gonglu Xuebao, 2007, 4 (48-52):
- [9] Stress distribution in anchorage zone between beam and cable for cable-stayed bridge with steel box girder Harbin Gongye Daxue Xuebao, 2009, 6 (150-154): : 150 - 154
- [10] Bridge Deck Transverse Stress Analysis of Arch Tower Cable-Stayed Bridge With Steel Box Girder SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1240 - 1244