Generator maintenance scheduling with transmission constraints using intelligent approach

被引:0
作者
Kumarappan, N. [1 ]
Suresh, K. [2 ]
Babu, V.S. [1 ]
机构
[1] Department of Electrical Engineering, Annamalai University, Annamalai Nagar Tamil Nadu 608 002, India
[2] Department of Electrical Engineering, Sri Manakula Vinayagar Engineering College, Pondicherry 605 017, India
来源
Journal of the Institution of Engineers (India): Electrical Engineering Division | 2011年 / 92卷 / JUNE期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
12
引用
收藏
页码:32 / 38
相关论文
共 50 条
[31]   Automatic scheduling method using tabu search for maintenance outage tasks of transmission and substation system with network constraints [J].
Sawa, T ;
Furukawa, T ;
Nomoto, M ;
Nagasawa, T ;
Sasaki, T ;
Deno, K ;
Maekawa, T .
IEEE POWER ENGINEERING SOCIETY - 1999 WINTER MEETING, VOLS 1 AND 2, 1999, :895-900
[32]   An investigation into the effectiveness of simulated annealing as a solution approach for the generator maintenance scheduling problem [J].
Schluenz, E. B. ;
van Vuuren, J. H. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 53 :166-174
[33]   A Differential Evolution Approach to Optimal Generator Maintenance Scheduling of the Nigerian Power System [J].
Yare, Y. ;
Venayagamoorthy, G. K. .
2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, :2123-2130
[34]   Generator maintenance scheduling using a genetic algorithm with a fuzzy evaluation function [J].
Dahal, KP ;
Aldridge, CJ ;
McDonald, JR .
FUZZY SETS AND SYSTEMS, 1999, 102 (01) :21-29
[35]   Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints [J].
Marwali, MKC ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1160-1165
[36]   Coordinated Generation and Transmission Maintenance Scheduling Considering Network Constraints via GGDF and ODF [J].
Hussin, S. M. ;
Hassan, M. Y. ;
Wu, L. .
INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2016, 8 (01) :25-34
[37]   Annual coordinated generation and transmission maintenance scheduling considering network constraints and energy not supplied [J].
Niazi, Ahmad Norozpour ;
Badri, Ali ;
Khoshnoud, Sajjad .
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2015, 25 (09) :1831-1847
[38]   UNIT MAINTENANCE SCHEDULING WITH FUEL CONSTRAINTS [J].
ALKHAMIS, TM ;
VEMURI, S ;
LEMONIDIS, L ;
YELLEN, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (02) :933-939
[39]   An MILP Approach to Scheduling of Expansion and Maintenance Measures in Electrical Transmission Grids [J].
Schrief, Alexander B. ;
Sander, Miriam ;
Franken, Marco ;
Moser, Albert .
2021 56TH INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE (UPEC 2021): POWERING NET ZERO EMISSIONS, 2021,
[40]   Maintenance scheduling approach [J].
Shaalan, AM .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 1995, 20 (4A) :677-690