共 16 条
- [1] Talluri S., Baker R.C., A Quantitative Framework For DesigningEfficient Business Process Alliances, pp. 656-661, (1996)
- [2] Wu N., Mao N., Qian Y.M., An Approach to Partner Selection in Agile Manufacturing, Journal of Intelligent Manufacturing, 10, 7, pp. 519-529, (1999)
- [3] Wu N.Q., Su P., Selection of partners in virtual enterprise paradigm, Robotics and Computer Integrated Manufacturing, 21, pp. 119-131, (2005)
- [4] Su-Ping W.N., Zhao Q.Y., Qiang Y., The Improved Genetic Algorithm for Partner Selection and Optimization, Systems Engineering Theory & Practice, 12, pp. 85-91, (2006)
- [5] Ko C.S., Kim T., Hwang H., External part ner selection using tabu search heuristics in dist ributed manufacturing, International Journal of Production Research, 39, 17, pp. 3959-3974, (2001)
- [6] Ip W.H., Huang M., Yung K.L., Et al., Genetic Algorit Hm Solution For a Risk Based Partner Selection Problem In a Virtual Enterprise, 30, pp. 213-231, (2003)
- [7] Wang D., Yung K.L., Ip W.H., A heuristic geneticalgorit hm for subcontractor selection in a global manufacturing environment, IEEE Transactions On Systems, 31, 2, pp. 189-198, (2001)
- [8] Ip W.H., Yung K.L., Wang D., A branch and bound algorit hm for subcontractor selection in agile manufacturing environment, Int J Production Economics, 87, pp. 195-205, (2004)
- [9] Li N., Feng J.W., Zong-Ben X., The problem of Partner Selection in the Virtual Enterprise Management: Analysis of the models and theoretical, Journal of Operational Research, 9, 2, pp. 68-74, (2005)
- [10] Zeng Z.B., Li Y., Zhu W., Part Ner Selection With a Due Date Constraint In Virtual Enterprises, 175, 2, pp. 1353-1365, (2006)