摘要
In order to investigate more realistic group scheduling problems with position-dependent effects, the model of general position-dependent group scheduling is proposed, where the actual group setup times and actual processing times are described by general functions of the normal group setup time and position in the sequence. These general functions are not assumed to have specific function structures, and are not restricted to be monotone. By mathematical analysis and proof, each considered problem is decomposed into a group scheduling process and a job scheduling process, and each scheduling process is transferred into the classic assignment problem or the classic single-machine sequence problem, and then the computational complexity to solve the considered problem is analyzed. Analysis results show that, even with general position-dependent job processing times, both the single machine makespan minimization group scheduling problems and the parallel-machine total load minimization group scheduling problems remain polynomially solvable. © Copyright;.
引用
收藏
页码:354 / 359
相关论文
共 50 条
  • [1] Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong's Learning Effect
    Sun, Li
    Ning, Lei
    Huo, Jia-zhen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [2] Group Scheduling Problems with Time-Dependent and Position-Dependent DeJong's Learning Effect
    Sun, Li
    Ning, Lei
    Huo, Jia-Zhen
    Mathematical Problems in Engineering, 2020, 2020
  • [3] Scheduling Position-Dependent Maintenance Operations
    Drozdowski, Maciej
    Jaehn, Florian
    Paszkowski, Radoslaw
    OPERATIONS RESEARCH, 2017, 65 (06) : 1657 - 1677
  • [4] Flowshop Scheduling Problems with a Position-Dependent Exponential Learning Effect
    Cheng, Mingbao
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [5] Some scheduling problems with general position-dependent and time-dependent learning effects
    Yin, Yunqiang
    Xu, Dehua
    Sun, Kaibiao
    Li, Hongxing
    INFORMATION SCIENCES, 2009, 179 (14) : 2416 - 2425
  • [6] Two-agent scheduling problems with the general position-dependent processing time
    Yang, Liya
    Lu, Xiwen
    THEORETICAL COMPUTER SCIENCE, 2019, 796 : 90 - 98
  • [7] Single-Machine Group Scheduling Model with Position-Dependent and Job-Dependent DeJong's Learning Effect
    Qian, Jin
    Zhan, Yu
    MATHEMATICS, 2022, 10 (14)
  • [8] Machine scheduling problems with a position-dependent deterioration
    Huang, Xue
    Wang, Jian-Jun
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (10-11) : 2897 - 2908
  • [9] Proportionate flowshop scheduling with position-dependent weights
    Jiang, Chong
    Zou, Dexin
    Bai, Danyu
    Wang, Ji-Bo
    ENGINEERING OPTIMIZATION, 2020, 52 (01) : 37 - 52
  • [10] Scheduling jobs with position-dependent processing times
    Bachman, A
    Janiak, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (03) : 257 - 264