A frame-based dialogue management approach

被引:0
作者
University of West Bohemia in Pilsen, Department of Computer Science and Engineering, Pilsen, Czech Republic [1 ]
机构
来源
Int. Conf. Appl. Digit. Inf. Web Technol., ICADIWT | 1600年 / 327-332期
关键词
Compendex;
D O I
2nd International Conference on the Applications of Digital Information and Web Technologies, ICADIWT 2009
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [21] An improved method for measuring frame synchronization time parameters based on YOLOv4
    Li, Yunfa
    Liu, Guanxu
    Dai, Jie
    Yang, Ming
    Microprocessors and Microsystems, 2022, 93
  • [22] Fast multiple reference frame selection algorithm for H.264 based on spatial correlation
    Xu, Jing
    Zhou, Bing
    Huang, Xue-Li
    Li, Wei
    Cao, Lei
    Tongxin Xuebao/Journal on Communications, 2010, 31 (07): : 40 - 45
  • [23] TULSA, OKLAHOMA: AN APPROACH TO COMMUNITY ENERGY MANAGEMENT PLANNING.
    McAdams, James L.
    Vachon, Reginald I.
    Proceedings of the Intersociety Energy Conversion Engineering Conference, 1979, 2 : 1741 - 1745
  • [24] Optimum structural design for collimation frame of space-based two-dimensional turntable
    Xi'an Institute of Optics Precision Mechanics, Chinese Academy of Sciences, Xi'an
    710119, China
    不详
    100049, China
    Hongwai yu Jiguang Gongcheng Infrared Laser Eng.,
  • [25] A cyber-physical approach to the management and control of manufacturing systems
    Hozdić, Elvis
    Kozjek, Dominik
    Butala, Peter
    Strojniski Vestnik/Journal of Mechanical Engineering, 2019, 66 (01): : 61 - 70
  • [26] Database Management Systems—An Efficient, Effective, and Augmented Approach for Organizations
    Sharma, Anushka
    Karamchandani, Aman
    Dave, Devam
    Patel, Arush
    Doshi, Nishant
    Smart Innovation, Systems and Technologies, 2022, 248 : 465 - 478
  • [27] Research on Elevation Control Reliability of Rigid-Frame Bridge at Construction Stages Based on SVM
    基于SVM的刚构桥施工期标高控制可靠度研究
    2018, Wuhan Bridge Research Institute (48)
  • [28] MULTILEVEL APPROACH TO REAL TIME MANAGEMENT AND CONTROL SYSTEMS.
    Guran, M.
    Filip, F.
    Donciulescu, A.
    Muratcea, M.
    Orasanu, L.
    Predoiu, D.
    Radulescu, T.
    Economic Computation and Economic Cybernetics Studies and Research, 1981, 15 (01) : 23 - 33
  • [29] Dynamic responses of frame structures solved using DQEM and EDQ based time integration method
    Chen, Chang-New
    ASME Pressure Vessels Piping Div. Publ. PVP, 1600, (245-261):
  • [30] APPROACH TO ENERGY MANAGEMENT AT FALCONBRIDGE NICKEL-MINES-LIMITED
    DOYLE, DM
    CIM BULLETIN, 1979, 72 (810): : 82 - 91