Advanced planning and scheduling based on the constraint theory and improved tabu search algorithm

被引:1
作者
Zheng J. [1 ]
Mi X. [1 ]
Liao H. [1 ]
机构
[1] Business School, Sichuan University, Chengdu
基金
中国国家自然科学基金;
关键词
Advanced planning and scheduling; Bottleneck resources; Control methods; Optimization of production; Project scheduling; Theory of constraints;
D O I
10.2174/1872212113666191119103505
中图分类号
学科分类号
摘要
Background: Planning and scheduling of manufacturing enterprises are required to be rapid and accurate, which make is easy for the traditional enterprise resource planning system to meet the needs of enterprises. Objective: This paper introduces the theory of constraints and explains the control methods for production planning and scheduling. Methods: The main characteristics of the advanced planning and scheduling system are analyzed. Then, the modeling method based on the theory of constraints is used to study the scheduling path. Results: An example is given to validate the scheduling model and realize the optimization of production tasks on the bottleneck resources. Conclusion: The feasibility of the advanced planning and scheduling methods based on the theory of constraints is proved. © 2020, Bentham Science Publishers. All rights reserved.
引用
收藏
页码:221 / 228
页数:7
相关论文
共 28 条
[1]  
Umble E.J., Haft R.R., Umble M.M., Enterprise resource planning: Implementation procedures and critical success factors, Eur. J. Oper. Res, 146, 2, pp. 241-257, (2003)
[2]  
Al-Mashari M., Al-Mudimigh A., Zairi M., Enterprise resource planning: A taxonomy of critical factors, Eur. J. Oper. Res, 146, 2, pp. 352-364, (2003)
[3]  
Ovacik I.M., Advanced planning and scheduling systems: the quest to leverage ERP for better planning, Planning Production and Inventories in the Extended Enterprise, pp. 33-43, (2011)
[4]  
Dong P., Zhang X.L., ERP production planning module status, problems and optimization research, Petrochem. Ind. Appl, 10, pp. 1-8, (2012)
[5]  
Lupeikiene A., Dzemyda G., Kiss F., Caplinskas A., Ad-vanced planning and scheduling systems: Modeling and implementation challenges, Informatica, 25, 4, pp. 581-616, (2014)
[6]  
Xia Y., Research on Production Plan and Control in AMT Enterprise Supply Chain Environment, (2011)
[7]  
Chang B.R., Tsai H.F., Chen C.Y., Tsai Y.C., Assessment of In-Cloud enterprise resource planning system performed in a virtual cluster, Math. Probl. Eng, 4, pp. 1-11, (2015)
[8]  
Goldratt E.M., Cox J., The Goal: A Process of Ongoing Improvement, (1984)
[9]  
Ohno T., Toyota Production System: Beyond Large-Scale Production, (1988)
[10]  
Wang Nan, Zi Cheng Pan, Zhong Shan Hong, Patents: finFET device and fabrication method thereof, Appl, (2018)