The study of the relationship between quality assurance personnel and quality of public construction project by using statistical inferences

被引:0
|
作者
机构
[1] Kong, Derick
[2] Wang, Lung-Chuang
[3] Hsu, Tsung-Hung
来源
Kong, D. | 1600年 / Chinese Institute of Civil and Hydraulic Engineering, 4th, FL.1, Jen-ai Rd., Sec.2, Taipei, Taiwan卷 / 25期
关键词
Analysis of variance (ANOVA);
D O I
暂无
中图分类号
学科分类号
摘要
For years, the public construction projects have played a leading role in promoting Taiwan's economy. For the purpose of improving construction quality, the public construction committee of the government plans to lower the recruiting threshold, meaning the specific contract price that contractor has to hire the full-time quality assurance personnel, from NT$50 million to NT$20 million since July, 2012. However, both the effectiveness of quality assurance personnel on construction quality and the theoretical background of the aforementioned recruiting threshold of quality assurance personnel are still in question. Therefore, the present study first collected actual public construction projects, 2,395 cases, from 2011 to 2012 and verified those data by rigorous statistical methods such as independent samples T-test and analysis of variance (ANOVA). The research result places sound foundations for setting recruiting threshold of the quality assurance personnel as well as provide references for policymaking of the public construction quality policies.
引用
收藏
相关论文
共 50 条
  • [21] Feasibility study of using statistical process control to customized quality assurance in proton therapy
    Rah, Jeong-Eun
    Shin, Dongho
    Oh, Do Hoon
    Kim, Tae Hyun
    Kim, Gwe-Ya
    MEDICAL PHYSICS, 2014, 41 (09)
  • [22] Monitoring project duration and cost in a construction project by applying statistical quality control charts
    Aliverdi, Reza
    Naeni, Leila Moslemi
    Salehipour, Amir
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) : 411 - 423
  • [23] Evaluation of Dynamic Cone Penetration Quality for Cohesive Soil Embankment Construction Pilot Project for New Specification for Quality Control and Quality Assurance
    Larsen, Brett W.
    White, David J.
    Jahren, Charles T.
    TRANSPORTATION RESEARCH RECORD, 2008, 2081 (2081) : 92 - 100
  • [24] ASSESSING QUALITY MANAGEMENT RELATIONSHIP IN PUBLIC CONSTRUCTION IN TAIWAN USING FAULT TREE ANALYSIS
    Lee, Shyh-Hwang
    Chen, Yu-Cheng
    MANAGEMENT RESEARCH AND PRACTICE, 2011, 3 (02): : 36 - 45
  • [25] Relationship between service customers' quality assurance behaviors, satisfaction, and effort: A cost of quality perspective
    Youngdahl, W.E.
    Kellogg, D.L.
    Journal of Operations Management, 1997, 15 (01): : 19 - 32
  • [26] Reconstructing the Interaction Relationship between Cost and Quality of the Project
    Tang Hong
    Zhao Yu-feng
    REGULATORY REGIONAL ECONOMIC CHALLENGE FOR MINING, INVESTMENT, ENVIRONMENT AND WORK SAFETY, 2010, : 164 - 166
  • [27] Exploring the Relationship between Dockerfile Quality and Project Characteristics
    Wu, Yiwen
    2020 ACM/IEEE 42ND INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING: COMPANION PROCEEDINGS (ICSE-COMPANION 2020), 2020, : 128 - 130
  • [28] Cultural heritage in project management: project appraisal and quality assurance in the early phase of major public investments
    Stendebakken, Mari Oline Giske
    Olsson, Nils O. E.
    IMPACT ASSESSMENT AND PROJECT APPRAISAL, 2018, 36 (02) : 131 - 144
  • [29] Case study of applying statistical techniques for the Quality Assurance in a paint industry
    Vourvahi, C
    Voutsinas, J
    Kiriakidis, J
    INDUSTRIAL STATISTICS: AIMS AND COMPUTATIONAL ASPECTS, 1997, : 27 - 49
  • [30] Study of the Impact of Construction Quality Management on the Project Cost
    Li, Peng
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ECONOMY, MANAGEMENT AND EDUCATION TECHNOLOGY, 2016, 62 : 839 - 842