Experimental study on joint behaviour of immersed tunnel subjected to differential settlement

被引:0
|
作者
Li, Jianfeng [1 ,2 ]
Ni, Pengpeng [1 ,2 ]
Lu, Zhiwang [1 ,2 ]
机构
[1] Sun Yat sen Univ, Sch Civil Engn, State Key Lab Tunnel Engn, Guangzhou 510275, Peoples R China
[2] Southern Marine Sci & Engn Guangdong Lab Zhuhai, Zhuhai 519082, Peoples R China
基金
中国国家自然科学基金;
关键词
Immersed tunnel; Differential settlement; Joint behaviour; Axial constraint; MODEL TESTS; DESIGN;
D O I
10.1016/j.tust.2024.106261
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Differential settlement can cause concentrated deformation in the joints of immersed tunnel during its service stage. In this study, a model for simulating immersion joint was proposed, and tests on immersed tunnels under varying differential settlement were conducted. The mechanical behaviours of joints, including vertical displacement, shear displacement, rotation angle, and joint opening, were systematically analysed. Upon the successful simulation of joint against other works, further experiments were performed to underscore the influence of axial constraint and location of differential settlement. Results indicate that axial constraints can enhance the load transfer capacity and improve the uniformity of joint shear forces and rotation angles, accommodating a larger allowable range of differential settlement for immersed tunnel. The parameter of accommodating deformation ratio was defined to characterise the ratio between maximum axial deformation of joint to compression amount of Gina gasket, which could evaluate the effects of axial constraints on joint opening. Setting the accommodating deformation ratio to 1 can increased the allowable differential settlement by 36%. The location of differential settlement affected the load distribution greatly, with respect to shear and bending behaviour of joints. Settlement at the mid-span of a tunnel element rather than a joint was generally safer for immersed tunnel.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Analytical model of buried beams on a tensionless foundation subjected to differential settlement
    Zhang, Bing-qiang
    Chen, Fu-quan
    Wang, Qi-yun
    Lin, Luo-bin
    APPLIED MATHEMATICAL MODELLING, 2020, 87 : 269 - 286
  • [32] Benefits of geosynthetic reinforcement in widening of embankments subjected to foundation differential settlement
    Miao, L.
    Wang, F.
    Han, J.
    Lv, W.
    GEOSYNTHETICS INTERNATIONAL, 2014, 21 (05) : 321 - 332
  • [33] Superstructure damages due to the joint effects of differential ground settlement and machinery vibration: a case study
    Liao, Xin
    Chen, Zhiliang
    Dai, Weiyong
    Qu, Liming
    Xie, Zhuowu
    Tang, Qiang
    GEOMATICS NATURAL HAZARDS & RISK, 2024, 15 (01)
  • [34] Waterproof performance and failure mechanism of GINA gasket subject to diverse joint deformations: A case study of the Yuliangzhou immersed tunnel
    Hu, Zhinan
    Sun, Yadong
    Jiang, Lian
    Mao, Hongtao
    Xu, Yu
    Luo, Yonghuan
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2025, 22
  • [35] A hybrid physical data informed DNN in axial displacement prediction of immersed tunnel joint
    Yan, Wei
    Yan, Yu
    Shen, Ping
    Zhou, Wan-Huan
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2023, 17 (01) : 169 - 180
  • [36] Design of a distributed optical fiber sensor system for measuring immersed tunnel joint deformations
    Zhang, Xuehui
    Broere, Wout
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 131
  • [37] Analytical solution of seismic response of flexible joint of immersed tunnel crossing different strata
    Zhou Huan-zhu
    Liu Sheng-an
    Li Bin
    Chen Wei-yun
    Su Lei
    Zheng Jun-jie
    Zheng Ye-wei
    ROCK AND SOIL MECHANICS, 2024, 45 : 289 - 298
  • [38] Load-settlement behaviour of membrane-confined grouted pile: experimental and analytical study
    Xu, Meijuan
    Zhang, Fuyou
    Ni, Pengpeng
    Mei, Guoxiong
    ACTA GEOTECHNICA, 2023, 18 (05) : 2777 - 2793
  • [39] Analyzing immediate settlement of Hong Kong-Zhuhai-Macao Bridge immersed tunnel based on monitoring data
    Li, Bin
    Hou, Jinfang
    Min, Kaiyi
    Zhang, Jiaying
    SHIPS AND OFFSHORE STRUCTURES, 2021, 16 (S2) : 100 - 109
  • [40] Differential Settlement Control Technologies of the Long Submarine Tunnel Covered by Municipal Road
    Zhou, Cuiying
    Liu, Zhen
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 6: APPLIED GEOLOGY FOR MAJOR ENGINEERING PROJECTS, 2015, : 583 - 590