Experimental study on joint behaviour of immersed tunnel subjected to differential settlement

被引:0
|
作者
Li, Jianfeng [1 ,2 ]
Ni, Pengpeng [1 ,2 ]
Lu, Zhiwang [1 ,2 ]
机构
[1] Sun Yat sen Univ, Sch Civil Engn, State Key Lab Tunnel Engn, Guangzhou 510275, Peoples R China
[2] Southern Marine Sci & Engn Guangdong Lab Zhuhai, Zhuhai 519082, Peoples R China
基金
中国国家自然科学基金;
关键词
Immersed tunnel; Differential settlement; Joint behaviour; Axial constraint; MODEL TESTS; DESIGN;
D O I
10.1016/j.tust.2024.106261
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Differential settlement can cause concentrated deformation in the joints of immersed tunnel during its service stage. In this study, a model for simulating immersion joint was proposed, and tests on immersed tunnels under varying differential settlement were conducted. The mechanical behaviours of joints, including vertical displacement, shear displacement, rotation angle, and joint opening, were systematically analysed. Upon the successful simulation of joint against other works, further experiments were performed to underscore the influence of axial constraint and location of differential settlement. Results indicate that axial constraints can enhance the load transfer capacity and improve the uniformity of joint shear forces and rotation angles, accommodating a larger allowable range of differential settlement for immersed tunnel. The parameter of accommodating deformation ratio was defined to characterise the ratio between maximum axial deformation of joint to compression amount of Gina gasket, which could evaluate the effects of axial constraints on joint opening. Setting the accommodating deformation ratio to 1 can increased the allowable differential settlement by 36%. The location of differential settlement affected the load distribution greatly, with respect to shear and bending behaviour of joints. Settlement at the mid-span of a tunnel element rather than a joint was generally safer for immersed tunnel.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Assessment of joint behaviour of immersed tunnel with prefabricated push-out closure joint under differential settlement
    Li, Jianfeng
    Ni, Pengpeng
    CANADIAN GEOTECHNICAL JOURNAL, 2025, 62 : 1 - 17
  • [2] Mechanical Model for Joints of Immersed Tunnel Considering the Influence of Joint Differential Settlement
    Liu, Peng
    Chen, Ji
    Chen, Yanhong
    Yang, Jianxin
    Tang, Qiang
    INTERNATIONAL JOURNAL OF GEOSYNTHETICS AND GROUND ENGINEERING, 2020, 6 (04)
  • [3] Mechanical Model for Joints of Immersed Tunnel Considering the Influence of Joint Differential Settlement
    Peng Liu
    Ji Chen
    Yanhong Chen
    Jianxin Yang
    Qiang Tang
    International Journal of Geosynthetics and Ground Engineering, 2020, 6
  • [4] Segmental joint model tests of immersed tunnel on a settlement platform: A case study of the Hongkong-Zhuhai-Macao Bridge
    Hu, Zhi-nan
    Xie, Yong-li
    Xu, Guo-ping
    Bin, Sheng-lin
    Zhang, Hong-guang
    Lai, Hong-peng
    Liu, Hong-zhou
    Yan, Chang-gen
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 78 : 188 - 200
  • [5] Analysis of settlement control measures in immersed tunnel
    Wei, Gang
    Qiu, Hui-jie
    Wei, Xin-jiang
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1449 - 1453
  • [6] Seismic performance study of immersed tunnel with longitudinal limit device of flexible joint
    Li, Yadong
    Lai, Junjie
    Yang, Yong
    Zhou, Jinwen
    Shan, Yi
    Cui, Jie
    UNDERGROUND SPACE, 2025, 20 : 17 - 32
  • [7] Calculation and Analysis of Pipe Joint Settlement Control in Large Back Silting Immersed Tube Tunnel
    Li, Zhijun
    Yue, Xiabing
    Wu, Guanqing
    SUSTAINABILITY, 2023, 15 (09)
  • [8] Development and application of automatic monitoring equipment for differential deformation of element joint in immersed tunnel
    Guo, Hongyan
    Yan, Yu
    Ding, Hao
    Liu, Xinrong
    Yang, Men
    FRONTIERS IN PHYSICS, 2023, 11
  • [9] Influencing Factors of Bearing Behavior of Settlement Reducing Pile Foundation for Immersed Tunnel
    Huang, Xiaohui
    Gong, Weiming
    Huang, Ting
    Xie, Richeng
    Xu, Guoping
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 779 - +
  • [10] Experimental study on mooring, towing and installing of immersed tunnel caissons
    Xiao L.-F.
    Yang J.-M.
    Li R.-P.
    Journal of Shanghai Jiaotong University (Science), 2010, 15 (01) : 103 - 107