Rapid start-up of biological purifying filter of groundwater containing high concentration of iron and manganese associated ammonia nitrogen

被引:0
|
作者
机构
[1] Cheng, Qingfeng
[2] Li, Dong
[3] Li, Xiangkun
[4] Zhang, Xiaojing
[5] Zhang, Jie
来源
Zhang, J. (6282031@163.com) | 1600年 / Harbin Institute of Technology卷 / 45期
关键词
Chemicals removal (water treatment) - Iron - Effluents - Nitrogen removal - Ammonia - Bandpass filters;
D O I
暂无
中图分类号
学科分类号
摘要
Biological manganese removal process has a problem of long start-up period, when it is adopted to purify groundwater containing high concentration of iron, manganese and ammonia nitrogen. In order to investigate the effect of circulation reflux on start-up, three starting modes with varying reflux ratio, constant reflux ratio and no reflux were adopted in three same filters. Results showed that the total iron, manganese and ammomia nitrogen in effluent of the three filters was below 0.3 mg/L, 0.05 mg/L and 0.2 mg/L on 51, 61 and 82 day, respectively; Variation of iron, manganese and ammonia nitrogen removal along the filter showed that the iron was removed mainly in the depth of 0-0.4 m, the manganese was adsorbed by manganese sand at the beginning and biological manganese removal was improved gradually after ammonia nitrogen reduced to be low enough. The circulation reflux is an effective way to shorten the start-up period of biological manganese removal process with high concentration of iron, manganese and ammonia nitrogen.
引用
收藏
相关论文
共 30 条
  • [1] Rapid start-up of biofilter for removal of iron and manganese from groundwater
    Zeng, Huiping
    Li, Dong
    Zhang, Jie
    ENVIRONMENT MATERIALS AND ENVIRONMENT MANAGEMENT PTS 1-3, 2010, 113-116 : 1316 - +
  • [2] The maximum manganese concentration of groundwater containing high concentration of iron, manganese and nitrogen
    Cheng, Qingfeng
    Li, Dong
    Li, Xiangkun
    Ren, Yuhui
    Zhang, Jie
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2014, 46 (04): : 20 - 24
  • [3] Simultaneous purification of high-iron, manganese and ammonia nitrogen from low temperature groundwater in biological filter
    Wang, Liu-Yu
    Li, Dong
    Zeng, Hui-Ping
    Zhang, Jie
    Zhongguo Huanjing Kexue/China Environmental Science, 2019, 39 (08): : 3300 - 3307
  • [4] RAPID START-UP OF A BIOLOGICAL FILTER IN A CLOSED AQUACULTURE SYSTEM
    CARMIGNANI, GM
    BENNETT, JP
    AQUACULTURE, 1977, 11 (01) : 85 - 88
  • [5] Rapid startup of two-stage bio-purification of low temperature groundwater containing high concentration of iron, manganese and ammonia nitrogen
    Wang, Liu-Yu
    Li, Dong
    Zeng, Hui-Ping
    Zhang, Jie
    Zhongguo Huanjing Kexue/China Environmental Science, 2019, 39 (06): : 2361 - 2369
  • [6] Microbial Community Analysis in Bio-filter Bed of Iron and Manganese Removal Treating High Iron, Manganese and Ammonia Nitrogen Groundwater
    Kang, Xiaorong
    Liu, Yali
    ENVIRONMENTAL BIOTECHNOLOGY AND MATERIALS ENGINEERING (2013), 2013, 777 : 238 - +
  • [7] Effects of dissolved oxygen on the start-up of manganese oxides filter for catalytic oxidative removal of manganese from groundwater
    Cheng, Ya
    Huang, Tinglin
    Liu, Chenyang
    Zhang, Shasha
    CHEMICAL ENGINEERING JOURNAL, 2019, 371 : 88 - 95
  • [8] Two-stage bio-purification technology of low temperature groundwater containing high concentration of iron, manganese and ammonia nitrogen
    Li D.
    Cao R.
    Yang H.
    Cheng S.
    Zeng H.
    Zhang J.
    Li, Dong (lidong2006@bjut.edu.cn), 2018, Harbin Institute of Technology (50): : 8 - 18
  • [9] Rapid start-up of biofilters for removal of ammonium, iron and manganese from ground water
    Stembal, T
    Markic, M
    Briski, F
    Sipos, L
    JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2004, 53 (07): : 509 - 518
  • [10] Start-Up of a Biofilter in a Full-Scale Groundwater Treatment Plant for Iron and Manganese Removal
    Zeng, Huiping
    Yin, Can
    Zhang, Jie
    Li, Dong
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (05)