An organizational cooperative coevolutionary algorithm for multimode resource-constrained project scheduling problems

被引:6
|
作者
Wang, Lixia [1 ]
Liu, Jing [1 ]
Zhou, Mingxing [1 ]
机构
[1] Key Laboratory of Intelligent Perception and Image Understanding of Ministry of Education, Xidian University, Xian,710071, China
来源
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics) | 2014年 / 8886卷
关键词
20;
D O I
10.1007/978-3-319-13563-2_57
中图分类号
学科分类号
摘要
引用
收藏
页码:680 / 690
相关论文
共 50 条
  • [41] A New MBS Representation for Resource-Constrained Project Scheduling Problems
    Hao, Xingxing
    Liu, Jing
    2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 217 - 224
  • [42] Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem
    Zhang, Lieping
    Luo, Yingxiong
    Zhang, Yu
    JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2015, 2015
  • [43] An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem
    Peng, L.
    Wuliang, P.
    Open Mechanical Engineering Journal, 2014, 8 (01): : 9 - 13
  • [44] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [45] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [46] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [47] Best Insertion Algorithm for Resource-constrained Project Scheduling Problem
    Pesek, Igor
    Zerovnik, Janez
    KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, : 169 - 176
  • [48] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [49] Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem
    Zhou, Yumiao
    Guo, Qingshun
    Gan, Rongwei
    2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, : 358 - 365
  • [50] A new genetic algorithm for resource-constrained project scheduling problem
    Luo Ronggui
    Chen Xiaoming
    Huang Minmei
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS 1 AND 2, 2006, : 1595 - 1599