共 50 条
- [41] Case Study on the Interaction Between Rectangular Pipe Jacking Control and Ground Settlement in Silty Clay International Journal of Civil Engineering, 2023, 21 : 1447 - 1462
- [42] Ground movement during concrete pipe piles jacking in silt deposit MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-3, 2011, 295-297 : 2024 - +
- [45] Analysis and prediction of ground settlement induced by shield construction in Xi'an loess strata Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (07): : 1087 - 1095
- [47] Analysis of soil vertical additional loads induced by pipe jacking construction Rock Soil Mech, (121-128):
- [49] Pipe-Soil Contact State and Jacking Force Prediction of Rectangular Pipe Jacking Dongbei Daxue Xuebao/Journal of Northeastern University, 2020, 41 (10): : 1459 - 1464