共 9 条
- [1] Kitada M., Masuya T., Tanaka H., Experimental house load operation at Tanagawa No.2 oil-fired power station, IEEE Transactions on Power Apparatus and Systems, PAS-100, 6, pp. 2796-2803, (1981)
- [2] De Mello F.P., Westcott J.C., Steam plant startup and control in system restoration, IEEE Transactions on Power Systems, 9, 1, pp. 93-101, (1994)
- [3] Huang W., Research and study of FCB test based on conventional configuration, Proc. International Conf. on Electronics, Communications and Control, pp. 4448-4450, (2011)
- [4] Li J., Lu E., Wang N., Wang C., Hou Y., Liu H., Research on influences of fast cut back units on post-separation control, The IASTED International Symposium on Power and Energy, (2013)
- [5] Ma Y., Li J., Long F., Wang C., Hou Y., Liu H., Influences of leading phase operation of FCB generating units on system restoration, The IASTED International Symposium on Power and Energy, (2013)
- [6] Sun W., Liu C.C., Zhang L., Optimal generator start-up strategy for bulk power system restoration, IEEE Transaction on Power Systems, 26, 3, pp. 1357-1366, (2011)
- [7] Lu E., Wang N., Qin Z., Liu H., Hou Y., Blackstart strategy for power grids including fast cut thermal power units, Proc. IEEE Power & Energy Society General Meeting, (2013)
- [8] Sensarma P.S., Rahmani M., A comprehensive method for optimal expansion planning using particle swarm optimization, Proc. IEEE Power Engineering Society Transmission and Distribution Conf, pp. 1317-1322, (2002)
- [9] Kennedy J., Eberhart R.C., Particle swarm optimization, Proc. IEEE International Conf. on Neural Networks, pp. 1942-1948, (1995)