Maintenance strategy implemented in the new thyssenkrupp CSA plant in Brazil

被引:0
|
作者
Pascotto, Ricardo [1 ]
Da Silva, Dalber [1 ]
Viana, Claudio [1 ]
Kolmbauer, Franz [2 ]
Stohl, Klaus [2 ]
Trnka, Karl [2 ]
机构
[1] ThyssenKrupp CSA Siderúrgica Do Atlântico (TKCSA), Av. Joao XXIII, Santa Cruz - Rio de Janeiro, 23560-352, Brazil
[2] Siemens VAI Metal Services Ltda. (SVAIS), Av. Joao XXIII, Santa Cruz - Rio de Janeiro, 23560-352, Brazil
来源
AISTech - Iron and Steel Technology Conference Proceedings | 2012年
关键词
Compendex;
D O I
AISTech 2012 Iron and Steel Technology Conference and Exposition
中图分类号
学科分类号
摘要
Maintenance
引用
收藏
页码:2755 / 2762
相关论文
共 2 条
  • [1] Optimised maintenance processes for the new plant construction– new electronics central workshop of DB heavy maintenance (EZW)
    Scheller, Herbert
    Leder, Martin
    Furtmair, Walter
    ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (03): : 118 - 121
  • [2] NEW COAL-BASED AMMONIA PLANT FOR BRAZIL.
    Goeke, Eberhard
    Wetzel, Rolf
    Coal Processing Technology, 1980, 6 : 133 - 139