共 13 条
- [1] Liu J., Ren J., Wei G., Thrust and torque characteristics based on a new cutter-head load model, Chinese Journal of Mechanical Engineering, 28, 4, pp. 801-809, (2015)
- [2] Zhang Z.-H., Qiao Y.-L., Study on the cutters' layout of cutter-head for full face tunnel boring machine, Engineering Mechanics, 28, 5, pp. 172-177, (2011)
- [3] Zhu D.-H., Song B., Multi-objective optimal layout of TBM normal cutters based on balanced rock breaking, Journal of Machine Design, 34, 11, pp. 1-6, (2017)
- [4] Sun W., Huo J.Z., Chen J., Et al., Disc cutters' layout design of the full-face rock tunnel boring machine (TBM) using a cooperative evolutionary algorithm, Journal of Mechanical Science and Technology, 25, 2, pp. 415-427, (2011)
- [5] Cheng J., Gong Y.-D., Li W., Et al., Analysis of breaking mechanism of tunnel boring machine cutter based on digital prototype technology, China Mechanical Engineering, 24, 14, pp. 1847-1853, (2013)
- [6] Ma H., Yin L., Gong Q., Et al., TBM tunneling in mixed-face ground: problems and solutions, International Journal of Mining Science and Technology, 25, 4, pp. 641-647, (2015)
- [7] Liu J.-Q., Bin H.-C., Guo W., Study on load characteristics of TBM cutter-head under mixed-face rock ground condition, Journal of Harbin Engineering University, 39, 3, pp. 575-583, (2018)
- [8] Yin H.-X., Design of cutter-head for mixed-face rock ground, China Concrete and Cement Products, 44, 8, pp. 69-71, (2017)
- [9] Cheng Y.-L., Zhong J., Ji Z.-Y., Et al., Geological adaptaive design method and application of TBM cutter-head, Journal of Mechanical Engineering, 54, 1, pp. 1-9, (2018)
- [10] Wu Q.-X., An G.-F., Zhou X.-W., Et al., Stress analysis and calculation of shield driven cutter-head in soft and hard composite stratum, Journal of Civil Engineering, 48, 2, pp. 321-326, (2015)