共 31 条
[1]
GAREY M R, SETHI J R., The Complexity of Flowshop and Jobshop Scheduling, Mathematics of Operations Research, 1, 2, pp. 117-129, (1976)
[2]
WANG Ling, WANG Jingjing, WU Chuge, Research Progress of Green Job Shop Scheduling Opti-mization, Control and Decision, 33, 3, pp. 385-391, (2018)
[3]
ZHOU Shouwei, ZHU Junlong, Contribute to The Path Exploration of "Carbon Peak and Carbon Neutralization"Strategy, Natural Gas Industry, 41, 12, pp. 1-8, (2021)
[4]
LIU Caijie, XU Zhitao, ZHANG Qin, Et al., Green Scheduling of Flexible Job Shop Based on NSGA- II under TOU Prower Price[J], China Mechanical Engineering, 31, 5, pp. 576-585, (2020)
[5]
WU X, SUN Y., A Green Scheduling Algorithm for Flexible Job Shop with Energy-saving Measures, Journal of Cleaner Production, 172, 3, pp. 3249-3264, (2018)
[6]
ASSIA S, ABBASSI I E, BARKANY A E, Et al., Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption, Advances in Operations Research, 2020, pp. 1-9, (2020)
[7]
YANG Dongjing, LEI Deming, A New Leapfrog Algorithm to Solve the Total Energy Consumption Constraint FJSP[J], China Mechanical Engineering, 29, 22, pp. 2682-2689, (2018)
[8]
LI Ming, LEI Deming, Research on Low Carbon Scheduling of Flexible Job Shop Considering Preparation Time and Key Objectives, Journal of Mechanical Engineering, 55, 21, pp. 139-149, (2019)
[9]
DEB K, PRATAP A, AGARWAL S, Et al., A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II, Transactions on Evolutionary Computation, 6, 2, pp. 182-197, (2002)
[10]
HAN Y, CHEN X, XU M, Et al., A Study on Multi-objective Flexible Job Shop Scheduling Problem Using a Non-dominated Sorting Genetic Algorithm [J], Mechanisms and Machine Science, 105, pp. 745-755, (2021)