共 50 条
- [31] DISTRIBUTORS CONSTRUCTION AND EQUIPMENT SURVEY - FF DISTRIBUTORS SHAPE UP STRONG ON CONSTRUCTION PLANS FOR 1978 QUICK FROZEN FOODS, 1978, 40 (08): : 26 - &
- [34] The Cost and Reduction Risk of Cemented-Back Monobore Well Construction JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2015, 54 (03): : 144 - 146
- [35] Formation of new methodological approaches to determining the cost of equipment for capital construction projects RSP 2017 - XXVI R-S-P SEMINAR 2017 THEORETICAL FOUNDATION OF CIVIL ENGINEERING, 2017, 117
- [36] Progress report on the construction of the northeast proton therapy center (NPTC) equipment PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3816 - 3818
- [37] The cost risk of speed-up a wafer fab construction Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 245 - 249
- [38] SHOP WINDOW FOR ELECTRONICS AND ELECTROMECHANICS IN EQUIPMENT CONSTRUCTION - REPORT ON ELECTRONICA 84 F&M-FEINWERKTECHNIK & MESSTECHNIK, 1985, 93 (02): : 74 - 80
- [40] Report shows OSHA inspections are up sharply in construction ENR (Engineering News-Record), 1997, 239 (23):