共 12 条
[1]
Hazir O., Erel E., Giinalay Y., Robust Optimization Models for the Discrete Time/Cost Trade-off Problem, Int. J. Prod. EconVol, 130, 1, pp. 87-95, (2011)
[2]
Hazir O., Haouari M., Erel E., Discrete Time/Cost Trade-off Problem: A Decomposition-based Solution Algorithm for the Budget Version, Comp. & Oper. Res, 37, 4, pp. 649-655, (2010)
[3]
Degirmenci G., Azizoglu M., Branch and Bound Based Solution Algorithms for the Budget Constrained Discrete Time/Cost Trade-off Problem, J. Oper. Res. Soc, 64, pp. 1474-1484, (2013)
[4]
Zhu G., Bard J. F., Yu G., A Two-stage Stochastic Programming Approach for Project Planning with Uncertain Activity Durations, J. Scheduling, 10, pp. 167-180, (2007)
[5]
Jeang A., Project Management for Uncertainty with Multiple Objectives Optimisation of Time, Cost and Reliability, Int. J. Prod. Res, 53, 5, pp. 1503-1526, (2015)
[6]
Brooks F. P., The Mythical Man-Month, Essays on Software Engineering, (1995)
[7]
Jorgensen T., Wallace S. W., Improving Project Cost Estimation by Taking into Account Managerial Flexibility, Eur. J. Oper. Res, 127, 2, pp. 239-251, (2000)
[8]
Birge J. R., Louveaux F., Introduction to Stochastic Programming, (1997)
[9]
Kolish R., Sprecher A., PSPLIB-A Project Scheduling Library, Eur. J. Oper. Res, 96, 1, pp. 205-216, (1997)
[10]
Davis E. W., Project Network Summary Measures Constrained-resource Scheduling, AIIE Trans, 7, 2, pp. 132-142, (1975)