Profit-oriented balancing of two-sided disassembly lines with resource-dependent task times

被引:0
|
作者
Demiralay, Yuksel Degirmencioglu [1 ]
Kara, Yakup [1 ]
机构
[1] Konya Tech Univ, Dept Ind Engn, Konya, Turkiye
来源
ROBOTIC INTELLIGENCE AND AUTOMATION | 2024年 / 44卷 / 06期
关键词
Disassembly line balancing; Linear programming; Two-sided disassembly line balancing; GENETIC ALGORITHM; SEARCH ALGORITHM; MODEL; OPTIMIZATION; DESIGN; END;
D O I
10.1108/RIA-05-2023-0069
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose - As a result of environmentally conscious production requirements in the world, the concept of disassembly has been a focus of interest by researchers and practitioners over the last two decades. Disassembly is an important process in circular economy to recover and reuse of parts and materials. End-of-life and large-sized products such as minibuses and trucks may be disassembled on two-sided lines. The ability of using both right and left sides of two-sided lines may increase line efficiency and reduce space requirements across the line. This paper aims to address a twosided disassembly line balancing problem (TSDLBP), which deals with assigning disassembly tasks, various equipments and assistants to the workstations to maximize total net recovery profit of the line. Design/methodology/approach - A detailed explanation of the TSDLBP is fi rst presented in the paper. A new 0-1 integer linear programming model is then proposed for the TSDLBP, aiming at maximizing total net recovery profit from disassembly of products. A set of test problems is generated, and an experimental analysis is conducted to make a comparison between traditional one-sided disassembly lines (TOSDL) and two-sided disassembly lines by means of performance improvement rate. Findings - Optimal results are obtained in 132 (81.48%) out of 162 the TOSDL balancing problems, while 92 (56.79%) out of 162 the TSDLBP using the proposed model. Total net recovery profits are compared on 88 problems for which optimal solutions are obtained in both the TOSDL and the TSDLBP. Results showed that implementing two-sided disassembly lines provides 29.18% increment in total net recovery profit compared to the TOSDL. Furthermore, the effects of different parameter levels on the net recovery profit are analyzed using two-way analysis of variance. According to the results, implementing two-sided disassembly line configuration increases total net recovery profit of the line significantly compared to traditional disassembly line configuration. Originality/value - The use of disassembly lines has become essential because of increasing consumption that results in a huge number of end-of- life products in the world. Two-sided disassembly lines may be preferred for dismantling large-sized products due to their high disassembly capacity and fewer space requirements. This paper proposes a new mathematical model for disassembly line balancing problem. The proposed model differs from the existing models by means of efficiently assigning limited disassembly resources as well as assigning disassembly tasks to the workstations to maximize total net recovery profit of the production system. The model allows decision-makers to consider several resource limitations when balancing their disassembly lines. The paper also provides a comprehensive experimental study to compare traditional and two-sided disassembly lines by means of profitability of disassembly processes.
引用
收藏
页码:910 / 921
页数:12
相关论文
共 50 条
  • [21] A genetic algorithm approach for balancing two-sided assembly lines with setups
    Delice, Yilmaz
    ASSEMBLY AUTOMATION, 2019, 39 (05) : 827 - 839
  • [22] Maximizing the profit per unit of time for the TSP with convex resource-dependent travelling times
    Zofi, Moshe
    Teller, Ron
    Kaspi, Moshe
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2017, 68 (10) : 1177 - 1182
  • [23] Task allocation decisions at human-robot two-sided disassembly line 4.0 and SERU disassembly units
    Almasarwah, Najat
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2024,
  • [24] Two-agent scheduling with linear resource-dependent processing times
    Wang, Dujuan
    Yu, Yugang
    Qiu, Huaxin
    Yin, Yunqiang
    Cheng, T. C. E.
    NAVAL RESEARCH LOGISTICS, 2020, 67 (07) : 573 - 591
  • [25] A station-oriented enumerative algorithm for two-sided assembly line balancing
    Hu, Xiaofeng
    Wu, Erfei
    Jin, Ye
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 186 (01) : 435 - 440
  • [26] Restart genetic flatworm algorithm for two-sided disassembly line balancing problem considering negative impact of destructive disassembly
    Liang, Junyong
    Guo, Shunsheng
    Du, Baigang
    Liu, Wenfang
    Zhang, Yunfei
    JOURNAL OF CLEANER PRODUCTION, 2022, 355
  • [27] Modeling and optimization for two-sided robots disassembly line balancing problems considering variable time
    Tuo Y.
    Zhang Z.
    Zhang Y.
    Zheng H.
    Liang W.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4073 - 4088
  • [28] An ant colony optimisation algorithm for balancing two-sided U-type assembly lines with sequence-dependent set-up times
    YILMAZ DELICE
    EMEL KIZILKAYA AYDOĞAN
    İSMET SÖYLEMEZ
    UĞUR ÖZCAN
    Sādhanā, 2018, 43
  • [29] Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach
    Jayaswal, Sachin
    Agarwal, Prashant
    JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (04) : 522 - 534
  • [30] An ant colony optimisation algorithm for balancing two-sided U-type assembly lines with sequence-dependent set-up times
    Delice, Yilmaz
    Aydogan, Emel Kizilkaya
    Soylemez, Ismet
    Ozcan, Ugur
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2018, 43 (12):